Substation Scout

Tallahatchie, MS interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
390 Not reported n/r 200 Solar Withdrawn
391 Not reported n/r 66 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first