Scott, MS interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
431 Not reported n/r 175 Solar Withdrawn
230 Not reported n/r 150 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.