0 active projects
totaling 0 MW in the TVA queue, plus 5 with terminal status (shown grayed).
0active projects
0active MW
5total filed
Queue ID
Project
kV
MW
Resource
Status
169
Not reported
n/r
1,450
Other
Withdrawn
153
Not reported
n/r
600
Other
Withdrawn
438
Not reported
n/r
200
Solar
Withdrawn
544
Not reported
n/r
110
Hybrid
Withdrawn
583
Not reported
n/r
63
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with TVA before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.