6 active projects totaling 1,304 MW in the TVA queue, plus 3 with terminal status (shown grayed).

6active projects
1,304active MW
9total filed
Queue IDProjectkVMWResourceStatus
207 Not reported n/r 1,183 Gas Withdrawn
208 Not reported n/r 1,183 Nuclear Operational
494 Not reported n/r 150 Hybrid Withdrawn
669 Not reported n/r 150 Solar Withdrawn
231 Not reported n/r 57 Nuclear Operational
180 Not reported n/r 25 Other Operational
259 Not reported n/r 23 Nuclear Operational
204 Not reported n/r 11 Other Operational
329 Not reported n/r 5 Nuclear Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.