0 active projects totaling 0 MW in the TVA queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
52 Not reported n/r 650 Other Withdrawn
542 Not reported n/r 200 Hybrid Withdrawn
349 Not reported n/r 17 Solar Withdrawn
244 Not reported n/r 16 Other Withdrawn
263 Not reported n/r 15 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.