0 active projects
totaling 0 MW in the TVA queue, plus 5 with terminal status (shown grayed).
0active projects
0active MW
5total filed
Queue ID
Project
kV
MW
Resource
Status
52
Not reported
n/r
650
Other
Withdrawn
542
Not reported
n/r
200
Hybrid
Withdrawn
349
Not reported
n/r
17
Solar
Withdrawn
244
Not reported
n/r
16
Other
Withdrawn
263
Not reported
n/r
15
Other
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with TVA before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.