Panola, MS interconnection queue

1 active project totaling 860 MW in the TVA queue, plus 6 with terminal status (shown grayed).

1active projects
860active MW
7total filed
Queue IDProjectkVMWResourceStatus
1 Not reported n/r 860 Other Operational
520 Not reported n/r 400 Hybrid Withdrawn
167 Not reported n/r 329 Other Withdrawn
194 Not reported n/r 329 Other Withdrawn
28 Not reported n/r 300 Other Withdrawn
293 Not reported n/r 200 Solar Withdrawn
344 Not reported n/r 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.