0 active projects
totaling 0 MW in the TVA queue, plus 7 with terminal status (shown grayed).
0active projects
0active MW
7total filed
Queue ID
Project
kV
MW
Resource
Status
83
Not reported
n/r
608
Other
Withdrawn
577
Not reported
n/r
230
Hybrid
Withdrawn
427
Not reported
n/r
200
Solar
Withdrawn
632
Not reported
n/r
69
Solar
Withdrawn
641
Not reported
n/r
69
Solar
Withdrawn
428
Not reported
n/r
50
Battery
Withdrawn
100
Not reported
n/r
25
Other
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with TVA before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.