Noxubee, MS interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
414 Not reported n/r 200 Solar Withdrawn
502 Not reported n/r 200 Solar Withdrawn
242 Not reported n/r 80 Other Withdrawn
579 Not reported n/r 39 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.