Substation Scout

Morgan, TN interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
239 Not reported n/r 202 Other Withdrawn
311 Not reported n/r 192 Gas Withdrawn
596 Not reported n/r 60 Solar Withdrawn
589 Not reported n/r 10 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.