Substation Scout

Montgomery, TN interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
141 Not reported n/r 630 Other Withdrawn
143 Not reported n/r 532 Other Withdrawn
574 Not reported n/r 200 Battery Withdrawn
395 Not reported n/r 154 Solar Withdrawn
559 Not reported n/r 100 Battery Withdrawn
560 Not reported n/r 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.