Monroe, MS interconnection queue

3 active projects totaling 235 MW in the TVA queue, plus 11 with terminal status (shown grayed).

3active projects
235active MW
14total filed
Queue IDProjectkVMWResourceStatus
647 Not reported n/r 440 Hybrid Withdrawn
602 Not reported n/r 240 Solar Withdrawn
606 Not reported n/r 200 Solar Withdrawn
443 Not reported n/r 160 Hybrid Withdrawn
553 Not reported n/r 150 Solar Withdrawn
249 Not reported n/r 119 Solar Withdrawn
313 Not reported n/r 100 Solar Active
671 Not reported 161 75 Hybrid Active
250 Not reported n/r 67 Solar Withdrawn
252 Not reported n/r 67 Solar Withdrawn
315 Not reported n/r 66 Solar Withdrawn
316 Not reported n/r 65 Solar Withdrawn
550 Not reported n/r 65 Solar Withdrawn
314 Not reported n/r 60 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.