Mississippi, AR interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
592 Not reported n/r 500 Hybrid Withdrawn
593 Not reported n/r 500 Hybrid Withdrawn
594 Not reported n/r 500 Hybrid Withdrawn
597 Not reported n/r 500 Solar Withdrawn
598 Not reported n/r 500 Solar Withdrawn
599 Not reported n/r 500 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.