Mcnairy, TN interconnection queue

2 active projects totaling 162 MW in the TVA queue, plus 9 with terminal status (shown grayed).

2active projects
162active MW
11total filed
Queue IDProjectkVMWResourceStatus
531 Not reported n/r 200 Hybrid Withdrawn
25RSC-007 Not reported 161 100 Battery Active
444 Not reported n/r 100 Hybrid Withdrawn
543 Not reported n/r 84 Solar Withdrawn
605 Not reported n/r 81 Battery Withdrawn
603 Not reported n/r 80 Solar Withdrawn
646 Not reported n/r 66 Solar Withdrawn
25RSC-006 Not reported 161 62 Solar Active
610 Not reported n/r 60 Solar Withdrawn
233 Not reported n/r 16 Hydro Withdrawn
237 Not reported n/r 16 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.