Mccracken, KY interconnection queue

2 active projects totaling 346 MW in the TVA queue, plus 7 with terminal status (shown grayed).

2active projects
346active MW
9total filed
Queue IDProjectkVMWResourceStatus
137 Not reported n/r 950 Other Withdrawn
124 Not reported n/r 640 Other Withdrawn
125 Not reported n/r 340 Other Withdrawn
464 Not reported n/r 300 Hybrid Withdrawn
25RSC-005 Not reported 161 250 Battery Active
500 Not reported n/r 200 Solar Withdrawn
222 Not reported n/r 122 Gas Withdrawn
226 Not reported n/r 122 Gas Withdrawn
609 Not reported 161 96 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.