Substation Scout

Marshall, KY interconnection queue

2 active projects totaling 840 MW in the TVA queue, plus 5 with terminal status (shown grayed).

2active projects
840active MW
7total filed
Queue IDProjectkVMWResourceStatus
133 Not reported n/r 640 Other Withdrawn
55 Not reported n/r 640 Other Operational
39 Not reported n/r 600 Other Withdrawn
42 Not reported n/r 600 Other Withdrawn
16 Not reported n/r 500 Other Withdrawn
58 Not reported n/r 300 Other Withdrawn
25RSC-004 Not reported 500 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.