Substation Scout

Madison, TN interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
179 Not reported n/r 752 Other Withdrawn
178 Not reported n/r 683 Other Withdrawn
389 Not reported n/r 200 Solar Withdrawn
393 Not reported n/r 130 Solar Withdrawn
518 Not reported n/r 55 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first