Substation Scout

Lawrence, TN interconnection queue

1 active project totaling 195 MW in the TVA queue, plus 8 with terminal status (shown grayed).

1active projects
195active MW
9total filed
Queue IDProjectkVMWResourceStatus
369 Not reported n/r 227 Solar Withdrawn
374 Not reported n/r 195 Solar Active
582 Not reported n/r 195 Solar Withdrawn
607 Not reported n/r 175 Solar Withdrawn
367 Not reported n/r 160 Solar Withdrawn
398 Not reported n/r 100 Solar Withdrawn
462 Not reported n/r 80 Solar Withdrawn
614 Not reported n/r 69 Solar Withdrawn
616 Not reported n/r 66 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.