2 active projects totaling 393 MW in the TVA queue, plus 17 with terminal status (shown grayed).

2active projects
393active MW
19total filed
Queue IDProjectkVMWResourceStatus
382 Not reported n/r 500 Solar Withdrawn
383 Not reported n/r 500 Solar Withdrawn
411 Not reported n/r 500 Solar Withdrawn
412 Not reported n/r 500 Solar Withdrawn
385 Not reported n/r 200 Solar Active
525 Not reported n/r 200 Hybrid Withdrawn
405 Not reported n/r 193 Solar Active
347 Not reported n/r 150 Solar Withdrawn
355 Not reported n/r 150 Solar Withdrawn
667 Not reported n/r 150 Solar Withdrawn
437 Not reported n/r 100 Hybrid Withdrawn
490 Not reported n/r 68 Solar Withdrawn
273 Not reported n/r 66 Solar Withdrawn
394 Not reported n/r 66 Solar Withdrawn
420 Not reported n/r 66 Solar Withdrawn
282 Not reported n/r 60 Solar Withdrawn
318 Not reported n/r 60 Solar Withdrawn
319 Not reported n/r 25 Solar Withdrawn
467 Not reported n/r 17 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.