Lauderdale, AL interconnection queue

1 active project totaling 75 MW in the TVA queue, plus 5 with terminal status (shown grayed).

1active projects
75active MW
6total filed
Queue IDProjectkVMWResourceStatus
516 Not reported n/r 150 Hybrid Withdrawn
376 Not reported n/r 100 Solar Withdrawn
432 Not reported n/r 100 Hybrid Withdrawn
258 Not reported n/r 75 Solar Operational
365 Not reported n/r 59 Solar Withdrawn
247 Not reported n/r 27 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.