Henderson, TN interconnection queue

2 active projects totaling 275 MW in the TVA queue, plus 1 with terminal status (shown grayed).

2active projects
275active MW
3total filed
Queue IDProjectkVMWResourceStatus
538 Not reported n/r 150 Hybrid Active
573 Not reported n/r 150 Solar Withdrawn
469 Not reported n/r 125 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.