Hardeman, TN interconnection queue

2 active projects totaling 270 MW in the TVA queue, plus 4 with terminal status (shown grayed).

2active projects
270active MW
6total filed
Queue IDProjectkVMWResourceStatus
25RSC-009 Not reported 161 250 Hybrid Active
477 Not reported n/r 200 Hybrid Withdrawn
399 Not reported n/r 150 Solar Withdrawn
384 Not reported n/r 83 Solar Withdrawn
268 Not reported n/r 20 Solar Withdrawn
79 Not reported n/r 20 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.