Grundy, TN interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 7 with terminal status (shown grayed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
507 Not reported n/r 160 Solar Withdrawn
227 Not reported n/r 151 Wind Withdrawn
460 Not reported n/r 150 Solar Withdrawn
633 Not reported n/r 150 Solar Withdrawn
224 Not reported n/r 130 Gas Withdrawn
555 Not reported n/r 40 Hybrid Withdrawn
554 Not reported n/r -75 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.