Gibson, TN interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 8 with terminal status (shown grayed).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
151 Not reported n/r 340 Other Withdrawn
189 Not reported n/r 340 Other Withdrawn
537 Not reported n/r 200 Wind Withdrawn
262 Not reported n/r 198 Wind Withdrawn
331 Not reported n/r 196 Wind Withdrawn
551 Not reported n/r 110 Hybrid Withdrawn
503 Not reported n/r 70 Solar Withdrawn
613 Not reported n/r 69 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.