Franklin, AL interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
97 Not reported n/r 931 Other Withdrawn
114 Not reported n/r 555 Other Withdrawn
563 Not reported n/r 198 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.