2 active projects totaling 838.6 MW in the TVA queue, plus 13 with terminal status (shown grayed).

2active projects
838.6active MW
15total filed
Queue IDProjectkVMWResourceStatus
25RSC-001 Not reported 500 691.6 Gas Active
170 Not reported n/r 640 Other Withdrawn
171 Not reported n/r 640 Other Withdrawn
161 Not reported n/r 550 Other Withdrawn
353 Not reported n/r 340 Solar Withdrawn
584 Not reported n/r 165 Solar Withdrawn
305 Not reported n/r 147 Solar Active
335 Not reported n/r 132 Solar Withdrawn
570 Not reported n/r 100 Hybrid Withdrawn
495 Not reported n/r 70 Solar Withdrawn
481 Not reported n/r 60 Solar Withdrawn
346 Not reported n/r 50 Solar Withdrawn
352 Not reported n/r 40 Solar Withdrawn
581 Not reported n/r 40 Hybrid Withdrawn
612 Not reported n/r 27 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.