Fayette, TN interconnection queue
2 active projects totaling 838.6 MW in the TVA queue, plus 13 with terminal status (shown grayed).
2active projects
838.6active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 25RSC-001 | Not reported | 500 | 691.6 | Gas | Active |
| 170 | Not reported | n/r | 640 | Other | Withdrawn |
| 171 | Not reported | n/r | 640 | Other | Withdrawn |
| 161 | Not reported | n/r | 550 | Other | Withdrawn |
| 353 | Not reported | n/r | 340 | Solar | Withdrawn |
| 584 | Not reported | n/r | 165 | Solar | Withdrawn |
| 305 | Not reported | n/r | 147 | Solar | Active |
| 335 | Not reported | n/r | 132 | Solar | Withdrawn |
| 570 | Not reported | n/r | 100 | Hybrid | Withdrawn |
| 495 | Not reported | n/r | 70 | Solar | Withdrawn |
| 481 | Not reported | n/r | 60 | Solar | Withdrawn |
| 346 | Not reported | n/r | 50 | Solar | Withdrawn |
| 352 | Not reported | n/r | 40 | Solar | Withdrawn |
| 581 | Not reported | n/r | 40 | Hybrid | Withdrawn |
| 612 | Not reported | n/r | 27 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.