Substation Scout

Desoto, MS interconnection queue

2 active projects totaling 1,015 MW in the TVA queue, plus 6 with terminal status (shown grayed).

2active projects
1,015active MW
8total filed
Queue IDProjectkVMWResourceStatus
44 Not reported n/r 900 Other Operational
102 Not reported n/r 640 Other Withdrawn
396 Not reported n/r 593 Gas Withdrawn
107 Not reported n/r 500 Other Withdrawn
186 Not reported n/r 500 Other Withdrawn
397 Not reported n/r 474 Gas Withdrawn
608 Not reported n/r 400 Battery Withdrawn
317 Not reported n/r 115 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.