Davidson, TN interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
267 Not reported n/r 1,220 Gas Withdrawn
166 Not reported n/r 1,100 Other Withdrawn
266 Not reported n/r 940 Gas Withdrawn
48 Not reported n/r 203 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.