Choctaw, MS interconnection queue

3 active projects totaling 1,757 MW in the TVA queue, plus 3 with terminal status (shown grayed).

3active projects
1,757active MW
6total filed
Queue IDProjectkVMWResourceStatus
84 Not reported n/r 875 Other Operational
70 Not reported n/r 815 Other Operational
50 Not reported n/r 800 Other Withdrawn
472 Not reported n/r 300 Hybrid Withdrawn
508 Not reported n/r 200 Hybrid Withdrawn
522 Not reported n/r 67 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.