Cheatham, TN interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
155 Not reported n/r 1,200 Other Withdrawn
567 Not reported n/r 990 Gas Withdrawn
154 Not reported n/r 600 Other Withdrawn
113 Not reported n/r 555 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.