Carter, TN interconnection queue

1 active project totaling 1 MW in the TVA queue.

1active projects
1active MW
1total filed
Queue IDProjectkVMWResourceStatus
253 Not reported n/r 1 Hydro Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.