Substation Scout

Carroll, TN interconnection queue

1 active project totaling 140 MW in the TVA queue, plus 3 with terminal status (shown grayed).

1active projects
140active MW
4total filed
Queue IDProjectkVMWResourceStatus
510 Not reported n/r 140 Solar Active
284 Not reported n/r 75 Solar Withdrawn
340 Not reported n/r 68 Solar Withdrawn
276 Not reported n/r 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.