Substation Scout

Calhoun, MS interconnection queue

0 active projects totaling 0 MW in the TVA queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
652 Not reported n/r 175 Solar Withdrawn
562 Not reported n/r 70 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first