Bledsoe, TN interconnection queue

1 active project totaling 150 MW in the TVA queue, plus 1 with terminal status (shown grayed).

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
478 Not reported n/r 155 Solar Withdrawn
501 Not reported n/r 150 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.