Substation Scout

Anderson, TN interconnection queue

2 active projects totaling 85 MW in the TVA queue, plus 4 with terminal status (shown grayed).

2active projects
85active MW
6total filed
Queue IDProjectkVMWResourceStatus
240 Not reported n/r 720 Nuclear Withdrawn
228 Not reported n/r 640 Gas Withdrawn
546 Not reported n/r 180 Battery Withdrawn
198 Not reported n/r 45 Other Operational
18 Not reported n/r 40 Other Operational
156 Not reported n/r 17 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first