Thomaston
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
2projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| THOMASTON 230kV NETWORK AREA IMPROVEMENT Rebuild the radial Thomaston - Butler 115kV line to 230kV network operation. Build a new 230kV switching station to replace end of life equipment. Make all necessary upgrades and accommodations at the substation and along the line. Retire all 230kV equipment at Thomaston, except the 230/115kV auto transformers. All 230kV lines into Thomaston will terminate at Smokey Hollow. TEAMS 16887 · plan p.223 · zone 213 |
GPC | In the plan p.17 |
Jun 1, 2029 | No change | Butler, Thomaston |
| GTC: BARNESVILLE PRIMARY - THOMASTON 230kV Rebuild 13.24 miles of the Barnesville Primary - Thomaston 230kV line with 200C 1351 ACSS conductor. Replace line switches and jumpers. TEAMS 21112 · plan p.201 · zone 213 |
GTC | In the plan p.15 |
Jun 1, 2029 | No change | Barnesville Primary, Thomaston |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.