Substation Scout

Tallulah Lodge

Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPCproject sponsor
2projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
CORNELIA - TALLULAH LODGE 115kV REBUILD
Rebuild approximately 9.7 miles of the Cornelia - Tallulah Lodge 115kV line with 200C 795 ACSS conductor.
TEAMS 10478 · plan p.237 · zone 212
GPC In the plan
p.18
Jun 1, 2030 No change Cornelia, Tallulah Lodge
TALLULAH LODGE - TOCCOA 115kV REBUILD
Rebuild the Tallulah Lodge - Toccoa 115kV Line with 100C 795 ACSR conductor (total of 10.3 miles). Replace limiting elements in substations along the line.
TEAMS 19995 · plan p.263 · zone 212
GPC In the plan
p.20
Jun 1, 2030 No change Tallulah Lodge, Toccoa

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first