SKC
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035), plus 1 on its cancelled or completed lists.
—county (not printed)
—kV in the quote
GTCproject sponsor
1projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: SKC 115kV BUS AND JUMPER REPLACEMENT Upgrade limiting elements at the SKC substation to a higher rating. TEAMS 19606 · plan p.135 · zone 206 |
GTC | In the plan p.11 |
Jun 1, 2027 | No change | SKC |
On the cancelled or completed lists
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| MEAG: ALCOVY ROAD - SKC 115 kV RECONDUCTOR TEAMS 13753 · zone 206 |
Not printed | Completed list p.26 |
Jun 1, 2025 as listed |
— | ALCOVY ROAD, SKC |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.
Site Scanner