Loopers Farm
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
Daltonproject sponsor
1projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| DU: LOOPERS FARM - SOUTH DALTON 230kV NETWORK UPGRADES Build new 230kV networked switching station on the Loopers Farm - South Dalton 230kV line, radialize South Dalton 230kV station, and build a new 230kV line from Loopers Farm - Jobs Creek with 200C 1351 ACSS Martin conductor TEAMS 13188 · plan p.93 · zone 211 |
Dalton | In the plan p.7 |
Jun 1, 2026 | New project | Loopers Farm, South Dalton |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.