Avery
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GTCproject sponsor
2projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: AVERY - HOPEWELL 115kV RECONDUCTOR Reconductor approximately 3.3 miles of the Avery - Hopewell 115kV line with 100C 1033 ACSR conductor. Replace substation equipment along the section of the line. TEAMS 19632 · plan p.275 · zone 202 |
GTC | In the plan p.20 |
Jun 1, 2031 | No change | Avery, Hopewell |
| GTC: AVERY - HOLLY SPRINGS 115kV REBUILD Rebuild 2.43 miles section of the Avery - Holly Springs 115kV line with 200C 1351 ACSS Martin conductor. TEAMS 21269 · plan p.307 · zone 201 |
GTC | In the plan p.23 |
Jun 1, 2035 | New project | Avery, Holly Springs |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.
Site Scanner