Substation Scout

Buford (China Grove)

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Scurry County. First named in the release with data as of October 1, 2026.

Scurrycounty as printed
138kV
ONCORutility
1projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Scurry, TX: ERCOT queue, 17 active of 23. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Scurry County South - China Grove 138 kV Double-Circuit Line
Loop the existing Snyder - Buford 138 kV Line into the existing Scurry County South 345/138 kV switch to establish the new Scurry County South Switch - Buford Switch138 kV Line. Install a new 5.6-mile, 138 kV second conductor on existing double-circuit structures from Scurry County South 138 kV Switch to Bufford 138 kV Switch.
ERCOT project 110603 · utility no. R8887
ONCOR
Tier 4
Conceptual
Future tab
138 Jun 2029 Scurry County South to Buford (China Grove)
Scurry County
Scurry County South, Buford (China Grove)

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110603First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.