Named in 1 listed project in ERCOT’s transmission project tracking workbook, in San Patricio County. First named in the release with data as of July 13, 2026.

San Patriciocounty as printed
345kV
AEP TCCutility
1projects listed

Described as new. The quoted wording calls this substation new. “Facet: Construct New 345 kV Station” — project 109722 title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in San Patricio, TX: ERCOT queue, 27 active of 28. Same county, not the same substation.

Location

San Patricio County, TX

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. TPIT places the station on the Angstrom to Grissom 345 kV line; its ends are AEP Angstrom Substation (OSM way 1089997597, 28.0443,-97.4384; the order: 'approximately 4 miles east of the City of Sinton and approximately 0.5 miles north of state highway 188 in San Patricio County') and Grissom. Grissom is located by PUCT Docket 51912's order as 'the existing AEP Texas Grissom station located approximately 8 miles southeast of the community of Skidmore, Texas and approximately 5.5 miles east of United States highway 181 in Bee County' (an unnamed OSM 345 kV transmission yard, way 1095736961 at 28.2183,-97.5567, fits that description). The station is somewhere on that line; no public document found that draws or describes its site.

Sources: ERCOT TPIT, project(s) 109722 (release 39, 2026-10-01) · PUCT Docket 51912, Order: AEP Texas Angstrom - Grissom 345-kV transmission line, San Patricio and Bee counties (n/d (order)), Order p.4 · OpenStreetMap: Angstrom Substation (way 1089997597) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Facet: Construct New 345 kV Station
Interconnect Titus Solar and Diamond Cowboy Storage to the new Facet 345 kV station on the Angstrom to Grissom 345 kV line
ERCOT project 109722 · utility no. TP2026145
AEP TCC
Tier 4
Planned
Future tab
345 Jun 2029 Facet
San Patricio County
Facet

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109722First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.