Listed projects that name no substation
209 projects in the current release, not cancelled, whose terminal columns, title and description print no substation name in a usable form. They are listed here so the directory’s omissions are visible.
Across all listed projects, the workbook’s terminal columns printed 267 planning-model bus numbers, 21 placeholders such as “NEWSUB” and 6 model identifiers in place of a name. None is treated as a substation name.
| Project | Utility | Status as reported | kV | Projected in service | Terminals |
|---|---|---|---|---|---|
| Add Branch between Padua and Sommers ERCOT project 79683 |
CPS Tier 4 |
Planned Completed tab |
138 | Feb 2025 actual 2025-02 |
5395 to 170722 Bexar County |
| 16th Street auto transformer replacement/addition. ERCOT project 99746 |
TNMP Tier 4 |
In-Service Current-year planned tab |
138 | Apr 2025 | No terminals printed |
| Avila BESS 138kV Gen Tie. ERCOT project 90446 |
TNMP Tier 4 |
Under Construction Current-year planned tab |
138 | May 2025 | No terminals printed Pecos County |
| Replacement of Lake Whitney auto transformer. ERCOT project 99776 |
TNMP Tier 4 |
In-Service Current-year planned tab |
138 | May 2025 | No terminals printed |
| Evelyn BESS 138kV Gen Tie. ERCOT project 90393 |
TNMP Tier 4 |
Under Construction Current-year planned tab |
138 | May 2025 | No terminals printed Galveston County |
| PMCR for 2nd TX in Coachwhip ERCOT project 82321 |
TNMP Tier 4 |
Not reported Current-year planned tab |
138 | May 2025 | No terminals printed |
| Addition of facilities installed at OCI ALAMO 1 substation to install a Gen-Tie to Power Soportar Battery Energy Storage System (BESS). ERCOT project 89905 |
CPS Tier 4 |
Planned Completed tab |
138 | May 2025 actual 2025-05 |
5007 to 171082 |
| Headcamp BESS 138kV Gen Tie. ERCOT project 90450 |
TNMP Tier 4 |
Under Construction Current-year planned tab |
138 | Jun 2025 | No terminals printed Pecos County |
| Add Cochise customer sub. ERCOT project 100408 |
TNMP Tier 4 |
In-Service Current-year planned tab |
138 | Jul 2025 | No terminals printed |
| Bocanova BESS 138kV Gen Tie. ERCOT project 90448 |
TNMP Tier 4 |
Under Construction Current-year planned tab |
138 | Jul 2025 | No terminals printed Brazoria County |
| Addition of the Mainland to Vertus 138KV line. ERCOT project 99859 |
TNMP Tier 4 |
Planned Current-year planned tab |
138 | Sep 2025 | No terminals printed |
| RCEC_BranchChanges_Kaufman_Update3 Modifying branch impedance between I20_RC and TALTY_RC ERCOT project 87510 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Dec 2025 | No terminals printed |
| RCEC_Add_CavenderBus Adding Cavender Bus, Load and Branch from Cavender to Cavender_P8 ERCOT project 87475 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Dec 2025 | No terminals printed |
| Models Pilot Point ERCOT project 104036 |
TNMP Tier 4 |
In-Service Current-year planned tab |
138 | Dec 2025 | No terminals printed Denton County |
| Adds an additional line and energize load. Adds a bundled double circuit line and energize both loads at Pilot Point bus #37365. ERCOT project 82250 |
TNMP Tier 4 |
Planned Current-year planned tab |
138 | Dec 2025 | No terminals printed |
| New substation for generation interconnection project for 21INR0359 ERCOT project 75792 |
LST Tier 4 |
Planned Current-year planned tab |
345 | Dec 2025 | No terminals printed Bosque County |
| Add_Josephine_Load Tapping the Nevada and Shelby transmission line, and adding Josephine Load. ERCOT project 72651 |
RCEC Tier 4 |
Not reported Current-year planned tab |
138 | Dec 2025 | No terminals printed |
| John_Dumas_Circuit_Breaker_Addition ERCOT project 92600A · utility no. PLC-7999 |
LCRATSC Tier 4 |
Planned Completed tab |
345 | Dec 2025 actual 2025-12 |
No terminals printed Caldwell County |
| John_Dumas_Circuit_Breaker_Addition ERCOT project 92600B · utility no. PLC-7999 |
LCRATSC Tier 4 |
Planned Completed tab |
345 | Dec 2025 actual 2025-12 |
No terminals printed |
| Trading Post to Cedar Valley Storm Hardening Upgrading switch to bring line to full rating ERCOT project 72588C |
PEC Tier 4 |
Not reported Completed tab |
138 | Dec 2025 actual 2025-05 |
No terminals printed |
| No title printed ERCOT project 87477 |
RCEC Tier 4 |
Planned Completed tab |
138 | Dec 2025 actual 2025-04 |
No terminals printed |
| This involves moving Harmony to a different bus/bay at Hill Country to alleviate the loading on HC auto 3 & 4. Move Harmony - Hill Country from Auto 3&4 to Hill Country Auto 1&2. This involves moving Harmony to a different bus/bay at Hill Country to alleviate the loading on HC auto 3 & 4. ERCOT project 99187 |
CPS/NO Tier 4 |
In-Service Completed tab |
138 | Dec 2025 actual 2025-12 |
5195 to 5210 Bexar County |
| Upgrade Metering CT Upgrading the Metering CT for Elm Creek to Skyline Circuit 2. This upgrade will result in a rating increase for this transmission line. ERCOT project 71879 · utility no. S-0939b |
CPS/NO Tier 4 |
In-Service Completed tab |
345 | Jan 2026 actual 2026-01 |
5133 to 5371 Guadalupe / Bexar County |
| Models YELLOWJACKET ERCOT project 103801 |
TNMP Tier 4 |
Not reported Current-year planned tab |
138 | Apr 2026 | No terminals printed Brazoria County |
| RCEC_Commerce_South_Load Adding Commerce South Bus, Load and Branch from Saddle to Comm_S1_8 ERCOT project 89957 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | May 2026 | No terminals printed Hunt County |
| This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4. Move Potranco - Cagnon from Auto 3 & 4 to Cagnon Auto 1 & 2. This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4. ERCOT project 99185 |
CPS/NO Tier 4 |
In-Service Completed tab |
138 | May 2026 actual 2026-04 |
5346 to 5055 Bexar County |
| LCRATSC_Colton_Elroy_Transmission_Line_Overhaul Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. ERCOT project 92561 · utility no. PLC-6951 · RTP 2024-SC20 |
LCRATSC Tier 4 |
Planned Completed tab |
138 | May 2026 actual 2026-05 |
7208 to 7209 Travis County |
| LCRATSC_Canyon_San_Marcos_Transmission_Line_Upgrade ERCOT project 92575 · utility no. PLC-7656 · RTP 2024-SC1 |
LCRATSC Tier 4 |
Planned Completed tab |
138 | May 2026 actual 2026-04 |
7192 to 7200 Hays County |
| Bluebonnet - Wyldwood Transmission Line Overhaul Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee. ERCOT project 92598 · utility no. PLC-6949 · RTP 2024-SC20 |
LCRATSC Tier 4 |
Planned Completed tab |
138 | May 2026 actual 2026-02 |
7210 to 7556 Bastrop County |
| Models Rice Tap ERCOT project 104040 |
TNMP Tier 4 |
Not reported Current-year planned tab |
138 | Jun 2026 | No terminals printed Collin / Grayson County |
| No title printed ERCOT project 105583 |
DME Tier 4 |
Planned Completed tab |
138 | Jul 2026 actual 2026-07 |
No terminals printed Denton County |
| Switchyard to accommodate for Telios Large Load. Added Kirkland and Telios bus, along with load and branches ERCOT project 91555 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Aug 2026 | No terminals printed |
| 138kV transmission upgrade to serve Kirkland large load. Modifying branch info between BLDSW_RC and BLACKLND_8 ERCOT project 91558 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Aug 2026 | No terminals printed |
| add 19.2 MVAR Capacitor at Rio Colorado ERCOT project 90851 |
STEC Tier 4 |
Planned Current-year planned tab |
69 | Aug 2026 | No terminals printed |
| Red Egret BESS 138kV Gen Tie. ERCOT project 90452 |
TNMP Tier 4 |
Under Construction Current-year planned tab |
138 | Aug 2026 | No terminals printed Galveston County |
| Add Fort Bobcat load serving station and Tline to STEC Orange Grove ERCOT project 102871 |
STEC Tier 4 |
Planned Current-year planned tab |
138 | Sep 2026 | No terminals printed Nueces County |
| RCEC_RockWallHwy276Load Adding Rockwall Highway Bus, Load and Branch from RockWallHwy to RCKWL_E1_8 ERCOT project 89959 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | No terminals printed |
| RCEC_BranchChanges_Kaufman_Update4 Updating branch info between I20_RC and COMBINRC1 ERCOT project 87512 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | No terminals printed |
| BEPC_TPIT102563_BrushieCap ERCOT project 102563 |
BEPC Tier 4 |
Planned Current-year planned tab |
69 | Oct 2026 | 199 Navarro County |
| Upgrade Eustace-Walton line to Cumberland conductor ERCOT project 91174 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 | No terminals printed |
| Addition of PEC CementPlant_Substation Adding PEC CementPlant_Substation substation. Adding bus, branch, and load. ERCOT project 91596 |
PEC Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 | No terminals printed |
| RCEC_BranchChanges_Kaufman_Update5 Updating line info between Boze and CombineRC1 ERCOT project 87514 |
RCEC Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 | No terminals printed |
| Add Embar 138 kV POD ERCOT project 93299 |
ONCOR Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 actual 2026-11 |
No terminals printed |
| BEPC_TPIT102630_Merryman ERCOT project 102630 |
BEPC Tier 4 |
Planned Current-year planned tab |
138 | Dec 2026 | No terminals printed Robertson County |
| 23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit This project is Phase 1 of the Spruce to Pawnee Double Circuit Rebuild. This Phase captures the completion of the new second circuit from Spruce to Pawnee with the final rating of circuit 2. ERCOT project 100018 · utility no. T-0400 · RPG 23RPG032 |
CPS/CPS, STEC Tier 1 |
Under Construction Current-year planned tab |
345 | Dec 2026 | 5400 to 5725 Bexar / Karnes County |
| BEPC_TPIT102767_OldGarner ERCOT project 102767 |
BEPC Tier 4 |
Planned Current-year planned tab |
138 | Dec 2026 | No terminals printed Parker County |
| Add Mosquito Lake Gen POI ERCOT project 99596 |
TNMP Tier 4 |
Planned Current-year planned tab |
138 | Dec 2026 | No terminals printed |
| 23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit This project is phase 2 of the Spruce to Pawnee Double circuit rebuild. Phase 2 captures the CPS owned portion of the existing Spruce to Pawnee circuit 1 being upgraded. The remaining STEC owned portion will be upgraded/completed at a later date. ERCOT project 100020 · utility no. T-0400 · RPG 23RPG032 |
CPS/CPS, STEC Tier 1 |
Under Construction Current-year planned tab |
345 | Dec 2026 | 5400 to 5725 Bexar / Karnes County |
| Hornsby Load Power Transformer Addition ERCOT project 91847B · utility no. PLC-8186 |
LCRATSC Tier 4 |
Planned Current-year planned tab |
345 | Dec 2026 | No terminals printed |
| This project will create a POI Bus (station) named Skydancer to interconnect 23INR0295 ERCOT project 75786 |
LST Tier 4 |
Planned Current-year planned tab |
345 | Dec 2026 | No terminals printed Bosque County |
| San Antonio South Reliability RPG Project Rebuild approximately 3 circuit miles of 138KV Transmission from Leon Creek to South San to meet current CPS Energy and industry standards. The new line will require a rating of 478MVA. ERCOT project 75255F · RPG 22RPG048 |
CPS/NO Tier 1 |
Under Construction Future tab |
138 | Jan 2027 | 5260 to 5385 Bexar County |
| Install a new 138kV switchyard to connect new El Patrimonio Solar PV Generation. The switchyard will be looped into the existing 138 kV Leon Creek to Trumbo transmission line. ERCOT project 109924 · utility no. T-0374 |
CPS/NO Tier 4 |
Under Construction Future tab |
138 | Jan 2027 | 5333 to 5260, 5429 Bexar County |
| San Antonio South Reliability RPG Project The Leon Creek to Howard Rd circuit should be upgraded to 698 MVA, minimum. ERCOT project 75255C · RPG 22RPG048 |
CPS/NO Tier 1 |
Under Construction Future tab |
138 | Jan 2027 | 5230 to 5260 Bexar County |
| RCEC_Horton_Load Added Horton bus, along with load and branches ERCOT project 89961 |
RCEC Tier 4 |
Planned Future tab |
138 | Mar 2027 | No terminals printed |
| Models ALUVIUM ERCOT project 104551 |
TNMP Tier 4 |
Planned Future tab |
138 | Mar 2027 | No terminals printed Brazoria County |
| RCEC_AllenNorthLoad Adding Allen North Load Bus, Load and Branch from Allen NLoad to RIDGVIEW_8 ERCOT project 89952 |
RCEC Tier 4 |
Planned Future tab |
138 | Mar 2027 | No terminals printed Collin County |
| Fayetteville AT2 Autotransformer Restoration LCRA will install, test, and commission a replacement 672 MVA Auto Transformer (AT2) to replace the existing failed unit. SMIT will manufacture and design the replacement 672MVA AT2 which is covered under warranty. The new unit will be identical in ratings but shall include additional improvements to mitigate sound level. The sound mitigation options will cost $550,120 and consist of upgraded core… ERCOT project 99917 |
LCRATSC Tier 4 |
Planned Future tab |
345 | Mar 2027 | No terminals printed |
| MODELS FLYCATCHER ERCOT project 105602 |
TNMP Tier 4 |
Planned Future tab |
138 | Mar 2027 | No terminals printed Reeves County |
| Add Dansk load serving substation Cuts in new Dansk load serving station on existing Red Bluff to Danevang transmission line ERCOT project 86782 |
STEC Tier 4 |
Planned Future tab |
138 | Apr 2027 | No terminals printed |
| Add Fresa load serving substation ERCOT project 92890 |
STEC Tier 4 |
Planned Future tab |
69 | Apr 2027 | No terminals printed Atascosa County |
| 23RPG032: San Antonio South Reliability II: Rebuild Pawnee to Tango into a double circuit Rebuild approximately 12 miles of existing horizontal single circuit 345kV transmission infrastructure into new vertical double circuit 345kV transmission infrastructure. ERCOT project 84900 · utility no. T-0401 · RPG 23RPG032 |
CPS/CPS, STEC, AEP Tier 1 |
Under Construction Future tab |
345 | Apr 2027 | 5725 to 8689 Karnes / Bee County |
| 23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit The final upgrades on the STEC side will be completed and the ultimate ratings of the double circuit will be realized. ERCOT project 84902 · utility no. T-0400 · RPG 23RPG032 |
CPS/CPS, STEC Tier 1 |
Under Construction Future tab |
345 | Apr 2027 | 5400 to 5725 Bexar / Karnes County |
| RCEC_BranchChanges_Kaufman_Update2 Modifying branch impedance between ROSHILRC and TALTY_RC ERCOT project 87508 |
RCEC Tier 4 |
Planned Future tab |
138 | May 2027 | No terminals printed Kaufman County |
| RCEC_BranchChanges_Kaufman__Update1 Modifying branch impedance between Boze and Scury_RC ERCOT project 87497 |
RCEC Tier 4 |
Planned Future tab |
138 | May 2027 | No terminals printed Kaufman County |
| 24RPG004: Omicron Reliability Project: Rebuild Leon Creek to Pearsal Rebuild ~1.6 miles of double-ckt from Leon Creek to Pearsall transmission line with normal and emergency ratings of at least 478MVA ERCOT project 88041 · utility no. T-0396 · RPG 24RPG004 |
CPS/NO Tier 2 |
Under Construction Future tab |
138 | May 2027 | 5260 to 5335 Bexar County |
| Hill Country Auto #4 will be replaced Summer 2027 to a 10% impedance auto. ERCOT project 100257 · utility no. S-0959 |
CPS/NO Tier 4 |
Planned Future tab |
345 | May 2027 | 5211 Bexar County |
| Silverleaf 345kV BUS from TNMP submitted Cowpen/Silverleaf RPG ERCOT project 105472 · RPG 23RPG013 |
TNMP Tier 1 |
Planned Future tab |
345 | May 2027 | No terminals printed Ward County |
| Hornsby Load Power Transformer Addition ERCOT project 91847C · utility no. PLC-8186 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2027 | No terminals printed |
| Upgrading Buda to Manchaca Upgrading Buda to Manchaca branch to minimum of 379 MVA. ERCOT project 91626 |
PEC Tier 4 |
Not reported Future tab |
138 | May 2027 | No terminals printed |
| Elroy_Wolf_Lane_Transmission_Line_Overhaul Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee ERCOT project 92622 · utility no. PLC-6950 · RTP 2024-SC20 |
LCRATSC Tier 4 |
In-Service Future tab |
138 | May 2027 | No terminals printed Bastrop / Travis County |
| Colton_Mendoza_Transmission_Line_Upgrade Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee ERCOT project 92627 · utility no. PLC-7994 · RTP 2024-SC20 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2027 | No terminals printed Caldwell / Travis County |
| Cedar Hill - Swiftex Transmission Line Upgrade Corrects topology for Elgin Tap and its associated branches ERCOT project 85977B · RPG 24RPG014 · RTP 2023-SC15 |
LCRATSC Tier 3 |
Planned Future tab |
138 | May 2027 | No terminals printed |
| Elgin - Elgin Tap Transmission Line Overhaul Perform an overhaul on the 2.2 mile T728 Elgin (structure #17/7) - Elgin Tap 138-kV transmission line. ERCOT project 85979 · RPG 24RPG014 · RTP 2023-SC15 |
LCRATSC Tier 3 |
Planned Future tab |
138 | May 2027 actual 9999-01 |
No terminals printed |
| 23RPG028: STEC Rio Medina Project: New transmission line between Tally and Ranchtown Install new 138kV single circuit transmission line from Ranchtown to Talley Road (~12 miles) with normal and emergency ratings of at least 469 MVA. This new transmission line requires a single route CCN. ERCOT project 84892 · utility no. T-0393 · RPG 23RPG028 |
CPS/NO Tier 2 |
Planned Future tab |
138 | May 2027 | 5422 to 5358 Medina / Bexar County |
| San Antonio South Reliability RPG Project Install a 3rd 600MVA 345/138kV autotransformer at Howard. ERCOT project 75255B · RPG 22RPG048 |
CPS/NO Tier 1 |
Planned Future tab |
345 | Jun 2027 | 5231 to 5230 Bexar County |
| ALUVIUM gen tie station ERCOT project 90903 |
TNMP Tier 4 |
Planned Future tab |
138 | Jul 2027 | No terminals printed Brazoria County |
| Add 80 MVar of cap banks at Miami Wind ERCOT project 110463 |
CTT Tier 4 |
Conceptual Future tab |
345 | Aug 2027 | No terminals printed Gray County |
| BEPC_TPIT102665_Greyfox ERCOT project 102665 |
BEPC Tier 4 |
Planned Future tab |
138 | Sep 2027 | No terminals printed Parker County |
| MODELS HALITE ERCOT project 105600 |
TNMP Tier 4 |
Planned Future tab |
138 | Oct 2027 | No terminals printed Pecos County |
| BEPC_TPIT102632_BLACKTHORN ERCOT project 102632 |
BEPC Tier 4 |
Planned Future tab |
69 | Oct 2027 | No terminals printed Ellis County |
| Elvis (EVS) 138kV CEHE Substation for ROCK N ROLL Storage (24INR0234) Install one generator lead from Elvis (EVS) 138kV CEHE Substation to customer-owned ROCK_N (RNR) for ROCK N ROLL Storage (24INR0234) customer substation. ERCOT project 90134B |
CNP Tier 4 |
Planned Future tab |
138 | Oct 2027 | ROCK_N Brazoria County |
| RCEC_Peerless_Load Adding Pearless Bus, Load and Branch from Pearless to PRLS_RC ERCOT project 89955 |
RCEC Tier 4 |
Planned Future tab |
138 | Nov 2027 | No terminals printed Hopkins County |
| BEPC_TPIT_KosseSW_Kosse ERCOT project 102559 |
BEPC Tier 4 |
Planned Future tab |
69 | Nov 2027 | 85 to 89 Limestone County |
| Add Liendo load serving substation ERCOT project 93048 |
STEC Tier 4 |
Planned Future tab |
138 | Dec 2027 | No terminals printed Waller County |
| Upgrade Sargent to Franklins Camp 2025 RTP ERCOT project 102867 |
STEC Tier 4 |
Planned Future tab |
69 | Dec 2027 | No terminals printed |
| Upgrades conductor rating ERCOT project 108819 · utility no. PBRP Upgrade L13 |
TNMP Tier 4 |
Planned Future tab |
138 | Dec 2027 | No terminals printed |
| Add Moursund load serving station ERCOT project 102865 |
STEC Tier 4 |
Planned Future tab |
138 | Dec 2027 | No terminals printed Victoria County |
| BEPC_NOTPIT_ClarkLakeVoltConv1 ERCOT project 70012A |
BEPC Tier 4 |
Planned Future tab |
138 | Dec 2027 | No terminals printed Parker County |
| Whitebaker 345kV - Part of Upgrade L13 2024 Permian Basin Study ERCOT project 92274 · utility no. PBRP Upgrade L13 |
TNMP Tier 1 |
Planned Future tab |
345 | Dec 2027 | No terminals printed |
| BEPC_TPIT102661_Pursley ERCOT project 102661 |
BEPC Tier 4 |
Planned Future tab |
69 | Dec 2027 | No terminals printed Navarro County |
| Cowpen 345kV Bus from TNMP submitted Cowpen/Silverleaf RPG ERCOT project 105470 · RPG 23RPG013 |
TNMP Tier 1 |
Planned Future tab |
345 | Dec 2027 | No terminals printed Reeves County |
| Georgetown Power Transformer Upgrade Upgrade the Georgetown 138-kV transmission bus to a four circuit breaker improved bus with Gas Insulated Switchgear (GIS). The new switchgear and all 138-kV series equipment should be rated at 4000 continuous amps. Upgrade Georgetown T1 and Georgetown T2. ERCOT project 99919 |
LCRATSC Tier 4 |
Planned Future tab |
138 | Dec 2027 | No terminals printed |
| BEPC_TPIT102659_KellerUpgrade ERCOT project 102659 |
BEPC Tier 4 |
Planned Future tab |
138 | Jan 2028 | 565 to 1856 Tarrant County |
| AEN_McNeil_JustinLn_Ckt_811_Reconductor Reconductor 3.98 miles of circuit to 3000 Amps. ERCOT project 105624 |
AEN Tier 4 |
Planned Future tab |
69 | Jan 2028 | 9291 to 9342 Travis County |
| Rebuild ~3 miles of double-ckt from VLSI to Grissom transmission line with normal and emergency ratings of at least 478MVA Rebuild ~3 miles of double-ckt from VLSI to Grissom transmission line with normal and emergency ratings of at least 478MVA. Note: Only the conductor needs to be upgraded. All other substation equipment is rated at least 2000A or 478MVA. ERCOT project 92743 · utility no. T-0377 |
CPS/NO Tier 4 |
Planned Future tab |
138 | Jan 2028 | 5467 to 5185 Bexar County |
| BEPC_NOTPIT_ClarkLakeVoltConv1 ERCOT project 70012B |
BEPC Tier 4 |
Planned Future tab |
138 | Mar 2028 | No terminals printed |
| BEPC_NOTPIT_ClarkLakeVoltConv1 ERCOT project 70012C |
BEPC Tier 4 |
Planned Future tab |
138 | Mar 2028 | No terminals printed Parker County |
| BEPC_NOTPIT_ClarkLakeVoltConv1 ERCOT project 70012D |
BEPC Tier 4 |
Planned Future tab |
138 | Mar 2028 | No terminals printed |
| BEPC_TPIT102755_Dennis ERCOT project 102755 |
BEPC Tier 4 |
Planned Future tab |
138 | Mar 2028 | No terminals printed Parker County |
| STEC Mesquite Large Load Project Phase 1 Construct Mesquite large load 345-kV POI ERCOT project 110828 |
STEC Tier 2 |
Conceptual Future tab |
345 | Apr 2028 | No terminals printed |
| BEPC_TPIT102670_Rockett ERCOT project 102670 |
BEPC Tier 4 |
Planned Future tab |
69 | Apr 2028 | No terminals printed Ellis County |
| BEPC_TPIT10264_Egan_HappyHill_Improvement ERCOT project 102634 |
BEPC Tier 4 |
Planned Future tab |
138 | Apr 2028 | 438 to 412 Johnson County |
| Upgrade Franklins Camp Auto ERCOT project 102875 |
STEC Tier 4 |
Conceptual Future tab |
138 | May 2028 | No terminals printed Brazoria County |
| Upgrading line Upgrading conductor to 1xSuwannee ERCOT project 99522 |
PEC Tier 4 |
Not reported Future tab |
138 | May 2028 | No terminals printed |
| Upgrading Buda to Rutherford Upgrading Buda to Rutherford branch to minimum 379 MVA. ERCOT project 91628 |
PEC Tier 4 |
Not reported Future tab |
138 | May 2028 | No terminals printed |
| LCRATSC_Gabriel-Schwertner TL conversion This project is needed to meet a request from BEPC to voltage convert (69-138-kV) and increase the capacity of the BEPC-owned Gabriel - Schwertner circuit on the TSC-owned 138-kV T359 transmission line. As part of this upgrade, LCRA TSC will upgrade conductor on T359 from Gabriel to Str. 21R. ERCOT project 91293 · utility no. PLC-8197 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | No terminals printed Williamson County |
| Lockhart Mendoza Transmission Line Overhaul Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee ERCOT project 92572 · utility no. PLC-8191 · RTP 2024-SC20 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | No terminals printed Caldwell County |
| Bastrop West - Bluebonnet Transmission Line Upgrade Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee. ERCOT project 92602 · utility no. PLC-8101 · RTP 2024-SC20 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | 7555 to 7556 Bastrop County |
| 36th St to Merida - 138 kV Transmission Line Rebuild Rebuild approximately four circuit miles of 138 kV transmission from 36th Street to Merida ERCOT project 17TPIT0001 · utility no. T-0196 |
CPS Tier 4 |
Planned Future tab |
138 | May 2028 | 5427 to 5310 Bexar County |
| CPSE_Rafter 138kV Cap Bank ERCOT project 50645 · utility no. S-0922 · RPG 24RPG004 |
CPS/NO Tier 4 |
Planned Future tab |
138 | May 2028 | 5355 Bexar County |
| Comfort_Kendall_Transmission_Line_Upgrade ERCOT project 100285B |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | No terminals printed |
| 23RPG028: STEC Rio Medina Project: Upgrade transmission line between Tally and Texas Research Upgrade existing Talley to TX Research line (~8 miles) to at least 469 MVA with a two-hour emergency rating, based on preliminary review should not require pole replacement. This transmission rebuild is in support of the Rio Medina RPG Project. This rebuild would prevent overloading the transmission system under adverse conditions. ERCOT project 84894 · utility no. T-0392 · RPG 23RPG028 |
CPS/NO Tier 2 |
Planned Future tab |
138 | May 2028 | 5422 to 5430 Medina / Bexar County |
| Add 230 MVAr of cap bank ERCOT project 110182 |
CTT Tier 4 |
Conceptual Future tab |
345 | May 2028 | No terminals printed Leon County |
| Helotes to Hill Country 2nd Ckt Addition and Rebuild ERCOT project 110911 · utility no. T-XXXX |
CPS Tier 1 |
Conceptual Future tab |
345 | Jun 2028 | No terminals printed |
| Add Reactive Support at Spruce ERCOT project 110921 |
CPS Tier 4 |
Conceptual Future tab |
345 | Jun 2028 | No terminals printed |
| Models TNMP Galveston RPG study ERCOT project 103257 |
TNMP Tier 2 |
Planned Future tab |
138 | Jun 2028 | No terminals printed Galveston / Brazoria County |
| Upgrading line to bundled drake ERCOT project 99516 |
PEC Tier 4 |
Not reported Future tab |
138 | Jun 2028 | No terminals printed |
| Adding Highway 71 between Wirtz and Johnson city Adding highway 71 into the model Summer 2028 ERCOT project 91621 |
PEC Tier 4 |
Not reported Future tab |
138 | Jun 2028 | No terminals printed |
| BPUB Branch Changes Removing branch Price to Loma, adding Price to Stillman, adding another branch Loma Alta to Stillman. ERCOT project 81895 |
BPUB Tier 4 |
Planned Future tab |
138 | Jun 2028 | 59410, 5962 to 79601, 79601 Cameron County |
| This models upgrades required for a proposed load addition. Install 300 MVAR capacitor bank at the NewSub. ERCOT project 110077C |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2028 | NewSub Waller County |
| Adds 2nd circuit from Allen Creek to Gray ERCOT project 110467 |
CTT Tier 3 |
Conceptual Future tab |
345 | Aug 2028 | No terminals printed Gray / Hall County |
| Add double ckt line from Allen Creek to Cross (Red Rock) ERCOT project 110471 |
CTT Tier 3 |
Conceptual Future tab |
345 | Aug 2028 | No terminals printed Gray / Hall County |
| Tap 2nd Limestone - Gibbons Creek ckt into CTT Iron Horse ERCOT project 110645 |
CTT Tier 3 |
Conceptual Future tab |
345 | Aug 2028 | No terminals printed Leon County |
| BEPC_TPIT102685_Add_Delia ERCOT project 102685 |
BEPC Tier 4 |
Planned Future tab |
69 | Sep 2028 | No terminals printed Limestone County |
| PSH Large Load Upgrade 138 kV line from Nquin_RC (6883) to Quinl_RC (6884) to Cumberland conductor. ERCOT project 109810 |
RCEC Tier 4 |
Planned Future tab |
138 | Oct 2028 | No terminals printed Hunt County |
| Faulkner 345kV - Part of Upgrade L5 2024 Permian Basin Study ERCOT project 92278 · utility no. PBRP Upgrade L5 |
TNMP Tier 1 |
Planned Future tab |
345 | Dec 2028 | No terminals printed Pecos / Reeves County |
| BEPC_TPIT_FortGatesSW_FortGates ERCOT project 102561 |
BEPC Tier 4 |
Planned Future tab |
69 | Dec 2028 | 250 to 254 Coryell County |
| 25RPG020 CPS Energy Large Load Additions Project: Rebuild Cagnon to VLSI transmission line Rebuild (8.7 miles) Cagnon to VLSI transmission line to at least 478MVA ERCOT project 99207 · utility no. T-0397 · RPG 25RPG020 |
CPS/NO Tier 1 |
Planned Future tab |
138 | Jan 2029 | 5055 to 5467 Bexar County |
| Cooke County Resiliency Project Rebuild the Sivells Bend Tap to Sivell’s bend transmission line ERCOT project 110943B · RPG 26RPG007 |
BEPC Tier 2 |
Planned Future tab |
69 | Feb 2029 | No terminals printed Cooke County |
| Install a new 138kV transmission loop and switchyard to connect new Moonstone Solar PV Generation ERCOT project 109958 · utility no. T-0414 |
CPS/NO Tier 4 |
Planned Future tab |
138 | Mar 2029 | 5313 to 5132, 5155 Wilson County |
| BEPC_TPIT102667_Bream ERCOT project 102667 |
BEPC Tier 4 |
Planned Future tab |
138 | Apr 2029 | No terminals printed Robertson County |
| STEC_110870_MesquiteLargeLoadProjectPhase2 Install up to 250 MVAR of dynamic reactive support at 91302 RODG_EDW POI 138-kV Substation Install up to 250 MVAR of dynamic reactive support at 5727 PAWNEESUB8 138-kV Substation ERCOT project 110870 |
STEC Tier 2 |
Conceptual Future tab |
138 | May 2029 | No terminals printed |
| STEC Palangana Large Load Addition Phase 1 Install up to 250 MVAR of dynamic reactive support at 91302 RODG_EDW POI 138-kV Substation Install up to 250 MVAR of dynamic reactive support at 5727 PAWNEESUB8 138-kV Substation ERCOT project 110581 |
STEC Tier 2 |
Conceptual Future tab |
138 | May 2029 | No terminals printed |
| Upgrading line Upgrade conductor to 1xSuwannee ERCOT project 99524 |
PEC Tier 4 |
Not reported Future tab |
138 | May 2029 | No terminals printed |
| Eagle Lake - El Campo Transmission Line Overhaul Perform an overhaul on the 38.2 mile T548 Eagle Lake - El Campo (including all tap lines) 69-kV transmission line. Per LCRA TSC Transmission System Planning procedure, replacement structures will be capable of operating at 138-kV. ERCOT project 99913 |
LCRATSC Tier 3 |
Planned Future tab |
69 | May 2029 | No terminals printed |
| The New Generation Facility will be looped into the 345 kV Elm Creek to South Texas Project (STP) circuit 1 ERCOT project 109966 · utility no. T-0420 |
CPS/NO Tier 4 |
Planned Future tab |
345 | May 2029 | 5236 to 5320, 5380 Guadalupe / Wilson County |
| Install new 138kV transmission loop and substation ERCOT project 111364 |
CPS/NO Tier 4 |
Planned Future tab |
138 | May 2029 | 5230 to 5326 Bexar County |
| Rebuild Apache-Amoco with bundled 795 ACSS ERCOT project 60502 |
TNMP Tier 4 |
Not reported Future tab |
138 | May 2029 | No terminals printed |
| Rebuild Caddo-Apache with bundled 795 ACSS ERCOT project 60504 |
TNMP Tier 4 |
Not reported Future tab |
138 | May 2029 | No terminals printed |
| Rebuild Hidden Lakes-League City with 795 ACSS ERCOT project 60522 |
TNMP Tier 4 |
Not reported Future tab |
138 | May 2029 | No terminals printed |
| Rebuild West Columbia Local-Angleton with 795 ACSS ERCOT project 60526 |
TNMP Tier 4 |
Not reported Future tab |
138 | May 2029 | No terminals printed |
| Second 138 kV transmission Line from DL-DP CKT1034 Second 138 kV transmission Line from Dunlap to Decker CKT1034 ERCOT project 67091 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2029 | 9045 to 9188 Travis County |
| Grandview Highland Hills Rebuild CPSE_Rebuild of 138 kV double circuit line Line between Grandview to Highland Hills. ERCOT project 45029 · utility no. T-0273 |
CPS/NO Tier 4 |
Planned Future tab |
138 | Jun 2029 | 5175 to 5205 Bexar County |
| BRYN_Standard_PMCR_Dansby_Rebuild_fix Reference Project 4577 which was added to convert Dansby 69kV bus to Breaker and a Half configuration ERCOT project 70307A |
BRYN Tier 4 |
Planned Future tab |
69 | Jun 2029 | No terminals printed Brazos County |
| BRYN_Standard_PMCR_Dansby_Rebuild_fix ERCOT project 70307B |
BRYN Tier 4 |
Planned Future tab |
69 | Jun 2029 | No terminals printed Brazos County |
| Altair - Eagle Lake Transmission Line Overhaul Perform an overhaul on the 11.4 mile T547 Altair - Eagle Lake (including all tap lines) 69-kV transmission line. Per LCRA TSC Transmission System Planning procedure, replacement structures will be capable of operating at 138-kV. ERCOT project 99908 |
LCRATSC Tier 4 |
Planned Future tab |
69 | Jun 2029 | No terminals printed |
| STEC Mesquite Large Load Project Phase 3 Upgrade 8162 COLETO4A - 8172 VICTORIA4A 138-kV Line CKT 1 Upgrade 8162 COLETO4A - 8172 VICTORIA4A 138-kV Line CKT 2 Upgrade 8535 POMPANO4A - 8735 CHALYBE4A 138-kV Line CKT 1 Upgrade 5705 FOWLERTNSUB8 - 5723 LOSANGLESUB8 138-kV Line CKT 1 Add a minimum 15MVAR shunt on 8412 REFUGIO4A or 8813 QUINTANA4A Upgrade 5689 AEPCHKCNSUB8 - 8404 SIGMOR4A 138-kV Line CKT 1 Upgrade 5723 LOSANGLESUB8 - 8612 REVEI… ERCOT project 110872 |
STEC Tier 2 |
Conceptual Future tab |
138 | Jul 2029 | No terminals printed |
| STEC Palangana Large Load Project Phase 2 Install reactive support at 80013 LARDVNTH4A 138-kV Substation ERCOT project 110845 |
STEC Tier 2 |
Conceptual Future tab |
138 | Jul 2029 | No terminals printed |
| Construct a new CPS Owned switchyard to connect new Lavender BESS Generation Project ERCOT project 109972 · utility no. T-0419 |
CPS/NO Tier 4 |
Planned Future tab |
138 | Jul 2029 | 5280 to 5110, 5255 Bexar County |
| STEC Palangana Large Load Project Phase3 Establish CCNG Palangana 345-kV POI Install reactive support at Palanaga POI to achieve unity power factor AEP Laredo Area Upgrades RPG Option 3 ERCOT project 110847 |
STEC Tier 2 |
Conceptual Future tab |
345 | Sep 2029 | No terminals printed |
| STEC Mesquite Large Load Project Phase 4 Install 200MVAR reactive support at Palangana POI to achieve unity power factor ERCOT project 110874 |
STEC Tier 2 |
Conceptual Future tab |
345 | Sep 2029 | 0 to 0 |
| BRYN_6666_Steele_Store_to_Cooks_Point Construct 138kV line from BTU Steele Store to LCRA Cooks Point (Bundled 1033 ACSR - Curlew & 959 ACSS Suwannee) ERCOT project 6666 · RPG 25RPG001 |
BRYN/BTU AND LCRA TSC Tier 1 |
Planned Future tab |
138 | Oct 2029 | 32852 to 7569 Brazos / Burleson County |
| BEPC_TIER1_Goatherd ERCOT project 105626 · RPG 25RPG004 |
BEPC Tier 1 |
Planned Future tab |
138 | Dec 2029 | No terminals printed Ellis County |
| Install a 3rd 600MVA autotransformer at Eastside. ERCOT project 110126 · RPG 25RPG013 and 25RPG017 |
CPS/NO Tier 1 |
Planned Future tab |
345 | Jan 2030 | 5137 to 5136 Bexar County |
| Rebuild Spruce to Eastside Double Circuit ERCOT project 87693 |
CPS Tier 3 |
Planned Future tab |
345 | Jan 2030 | No terminals printed |
| Cooke County Resiliency Project Construct a new breaker station “Bulcher” near Bulcher, TX Construct a new transmission line from Bulcher to Capps Corner Construct a new transmission line from Bulcher to Sivell’s Bend ERCOT project 110943A · RPG 26RPG007 |
BEPC Tier 2 |
Planned Future tab |
69 | Mar 2030 | No terminals printed Cooke County |
| Add 180MAr Cap at Elm Creek ERCOT project 110677 |
CPS/NO Tier 4 |
Conceptual Future tab |
345 | Mar 2030 | 5133 Bexar County |
| Rebuild Elm Creek to STP dbl Ckt ERCOT project 110665 · utility no. T-XXXX |
CPS/NO Tier 1 |
Conceptual Future tab |
345 | Mar 2030 | No terminals printed Bexar County |
| BEPC_TPIT102762_Whitney_Itasca ERCOT project 102762 |
BEPC Tier 4 |
Planned Future tab |
69 | Mar 2030 | No terminals printed Bosque County |
| Upgrade Aloe to Warburton ERCOT project 102873 |
STEC Tier 4 |
Conceptual Future tab |
69 | May 2030 | No terminals printed Victoria County |
| Upgrade Bakersfield to Schneeman Draw Upgrade Bakersfield - Cedar Canyon - Noelke - Schneeman Draw as part of the Permian Basin Reliability plan (project L15) ERCOT project 102877 |
STEC Tier 4 |
Planned Future tab |
345 | May 2030 | No terminals printed |
| Rebuild Elm Creek to Skyline ERCOT project 110637 · utility no. T-XXXX |
CPS/NO Tier 1 |
Conceptual Future tab |
345 | May 2030 | 5133 to 5371 Bexar County |
| BEPC_TPIT102663_Pursley_Emmett ERCOT project 102663 |
BEPC Tier 4 |
Planned Future tab |
69 | May 2030 | No terminals printed Navarro County |
| Orchrid_138_Switchyard ERCOT project 110935 |
CPS Tier 3 |
Conceptual Future tab |
138 | Jun 2030 | No terminals printed |
| Bottlebrush 345kV - Part of Upgrade L13 2024 Permian Basin Study ERCOT project 92276 · utility no. PBRP Upgrade L13 |
TNMP Tier 1 |
Planned Future tab |
345 | Jun 2030 | No terminals printed Pecos County |
| Castroville_to_Rafter_DblCkt_&_Rebuild Rebuild existing Castroville to Rafter ckt 1 (~6 miles) single circuit to have normal and emergency ratings of at least 3000A. Construct new Castroville to Rafter ckt 2 (~6 miles) to match ratings of ckt 1 ERCOT project 110907 · utility no. T-XXXX |
CPS Tier 3 |
Conceptual Future tab |
138 | Jun 2030 | 5083 to 5355 Medina County |
| WOH Area Upgrades ERCOT project 110913 |
CPS Tier 4 |
Conceptual Future tab |
138 | Jun 2030 | No terminals printed |
| Omicron Area Upgrades ERCOT project 110915 |
CPS Tier 4 |
Conceptual Future tab |
138 | Jun 2030 | No terminals printed |
| New_Grissom_Ingram_Circuit ERCOT project 110917 |
CPS Tier 3 |
Conceptual Future tab |
138 | Jun 2030 | No terminals printed |
| CPS Lylte Tline Rebuilds ERCOT project 110919 |
CPS Tier 4 |
Conceptual Future tab |
138 | Jun 2030 | No terminals printed |
| Castroville_345KVSwitchingStation_Changes ERCOT project 110923 |
CPS Tier 1 |
Conceptual Future tab |
345 | Jun 2030 | No terminals printed |
| Add Reactive Support ERCOT project 110925 |
CPS Tier 4 |
Conceptual Future tab |
345 | Jun 2030 | No terminals printed |
| AEN_Barton_Vega_Ckt_928_Reconductor ERCOT project 86315 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2030 | 9158 to 9285 Travis County |
| AEN_DP_OnionCreek_Ckt_924_Reconductor ERCOT project 86317 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2030 | 9187 to 9251 Travis County |
| AEN_OnionCreek_StoneyRidge_Ckt_1026_Reconductor ERCOT project 86333 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2030 | 9237 to 9251 Travis County |
| AEN_JustinLane_KoenigLane_Ckt__conversion_to_138kV Justin Lane Koenig Lane convert to 138kV ERCOT project 86838 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2030 | 9225 to 9227 Travis County |
| Addition of Highway 45 substation Addition of Highway 45 138 kV substation between Buda and Manchaca ERCOT project 104613 |
PEC Tier 4 |
Planned Future tab |
138 | Jul 2030 | No terminals printed |
| BEPC_TIER3_WhitneyAutoUpgrade ERCOT project 102993 · RPG 25RPG044 · RTP 2023-NC62 |
BEPC Tier 3 |
Planned Future tab |
345 | Oct 2030 | 240 Hill County |
| STEC Edwards Large Load Addition -Add a new 345kV path from Howard to Edward - Tap the line from Kendall to Cagnon at 5 miles from Cagnon to add the new CPS substation - Add a new 345kV path from New CPS station to Edward - Add 2 138/345kv autos at Edward with 675 MVA rating - Install 134 MVAR reaction power compensation at Lytle 4A - Upgrade the 138kV line from Bandera to Harmwolf to 371 MVA - Upgrade the 345kV Cachena to ELmcre… ERCOT project 110515 · RPG 25RPG046 |
STEC Tier 1 |
Conceptual Future tab |
138 | Dec 2030 | No terminals printed |
| AEN_MC_DE_CKT909_Reconductor ERCOT project 110270 |
AEN Tier 4 |
Planned Future tab |
138 | Dec 2030 | 9076 to 9193 Travis County |
| AEN_DL_AU_CKT920_Reconductor ERCOT project 110385 |
AEN Tier 4 |
Planned Future tab |
138 | Dec 2030 | 9045 to 9328 Travis County |
| AEN_Holman_Hillje_ckt_3123_reconductor ERCOT project 110168 |
AEN Tier 4 |
Planned Future tab |
345 | Dec 2030 | 9073 to 44200 Travis County |
| AEN_PilotKnob_CarsonCreek_Ckt_944_RECONDUCTOR ERCOT project 86329 |
AEN Tier 4 |
Planned Future tab |
138 | Dec 2030 | 9175 to 9259 Travis County |
| buffalo_clover_substation_addition Adding buffalo Clover PEC bus to Brazos Anduin Bus. ERCOT project 91578 |
PEC Tier 4 |
Not reported Future tab |
138 | Dec 2030 | No terminals printed |
| This models upgrades required for a proposed load addition Install 650 MVAR of static and dynamic VAR support at 345 kV NewSub. ERCOT project 110057D |
CNP Tier 4 |
Conceptual Future tab |
345 | Dec 2030 | NewSub Harris County |
| Upgrading two circuits to bundled Suwannee ERCOT project 110699 |
PEC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | No terminals printed |
| Upgrading two circuits to bundled Suwannee ERCOT project 110661 |
PEC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | No terminals printed |
| KC LCP upgrading circuit to bundled Suwanne Upgrading line T329 as part of AD_HOC TPIT report. Project is purely conceptual as of 7/2/2026. ERCOT project 110539 |
PEC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | No terminals printed |
| Rebuild Hill Country to Skyline Dbl Ckt ERCOT project 110687 · utility no. T-XXXX |
CPS/NO Tier 1 |
Conceptual Future tab |
345 | Mar 2031 | 5211 to 5371 Bexar County |
| Rebuild Howard to AVR ERCOT project 110689 · utility no. T-XXXX |
CPS/NO Tier 1 |
Conceptual Future tab |
345 | Mar 2031 | 5231 to 5475 Bexar County |
| Rebuild Hunt Lane to Medina Base ERCOT project 110691 · utility no. T-XXXX |
CPS/NO Tier 4 |
Conceptual Future tab |
138 | Mar 2031 | 5234 to 5305 Bexar County |
| Rebuild Medina to Pearsal ERCOT project 110693 · utility no. T-XXXX |
CPS/NO Tier 4 |
Conceptual Future tab |
138 | Mar 2031 | 5305 to 5335 Bexar County |
| Rebuild Talley to Medina ERCOT project 110695 · utility no. T-XXXX |
CPS/LCRA Tier 4 |
Conceptual Future tab |
138 | Mar 2031 | 5422 to 7432 Medina / Bandera County |
| Rebuild Helotes to Ranchtown ERCOT project 110663 · utility no. T-XXXX |
CPS/NO Tier 4 |
Conceptual Future tab |
138 | Mar 2031 | 5200 to 5358 Bexar County |
| Rebuild Hill Country to Marion Dbl Ckt ERCOT project 110675 · utility no. T-XXXX |
CPS/LCRA Tier 1 |
Conceptual Future tab |
345 | Mar 2031 | 5211 to 7044 Bexar / Guadalupe County |
| Rebuild Fair Oaks to LCRA Fair Oaks ERCOT project 110653 · utility no. T-XXXX |
CPS/LCRA Tier 4 |
Conceptual Future tab |
138 | Mar 2031 | 5470 to 7169 Bexar / Kendall County |
| Rebuild Chav to Palo Alto ERCOT project 110643 · utility no. T-XXXX |
CPS/NO Tier 4 |
Conceptual Future tab |
138 | Mar 2031 | 5085 to 5330 Bexar County |
| Cooke County Resiliency Project Rebuild the St Jo to Capps Corner transmission line Rebuild the Capps Corner to Nocona Transmission Line Rebuild the Nocona to Alcorn Transmission Line Construct a new transmission line from Bulcher to Alcorn ERCOT project 110943C · RPG 26RPG007 |
BEPC Tier 2 |
Planned Future tab |
69 | Mar 2031 | No terminals printed Cooke County |
| CPSE_Cagnon to Shepherd Rebuild (Phase B) ERCOT project 71877 · utility no. T-0281 |
CPS Tier 4 |
Planned Future tab |
138 | May 2031 | No terminals printed |
| LCRATSC_Euclid_Misty_Transmission_Line_Addition This project will construct two (2) new 345-kV transmission lines between Euclid and Misty substations. ERCOT project 105648 · RPG 26RPG001 |
LCRATSC Tier 1 |
Planned Future tab |
345 | Jun 2031 | No terminals printed Caldwell County |
| Cooke County Resiliency Project Convert existing 69 kV line from Gainesville to St Jo to 138 kV operation including: Gainesville, (future) Bud Long, (future) Hinton, Red River, (future) Gateway, (future) Army Camp, Sivells Bend, (future) Bulcher, Capps Corner, Nocona, Alcorn and St Jo ERCOT project 110943D · RPG 26RPG007 |
BEPC Tier 2 |
Planned Future tab |
138 | Sep 2031 | No terminals printed Cooke County |
| Rebuild the existing Five_pts to Wstside 138-kV transmission line ERCOT project 109994 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017 |
CPS/NO Tier 1 |
Planned Future tab |
138 | Jan 2032 | 5150 to 5490 Bexar County |
| Construct a new CPS Owned switchyard construction and gen tie to accommodate connection to the HUISACHE BESS & SOLAR generation site ERCOT project 109984 · utility no. S-XXXX · RPG 25RPG013 and 25RPG017 |
CPS/NO Tier 1 |
Planned Future tab |
138 | Jan 2032 | 5241 Bexar County |
| Rebuild the existing Medinabs to 36th Street 138-kV transmission line ERCOT project 109940 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017 |
CPS/NO Tier 1 |
Planned Future tab |
138 | Jan 2032 | 5305 to 5427 Bexar County |
| Upgrade Calallen to Driscoll ERCOT project 102869 |
STEC Tier 4 |
Conceptual Future tab |
69 | May 2032 | No terminals printed |
| Merida to Harlandale Rebuild CPSE_Merida to Harlandale Rebuild ERCOT project 45068 · utility no. T-0233 |
CPS Tier 4 |
Planned Future tab |
138 | May 2033 | No terminals printed Bexar County |
| AEN_MagnesiumPlant_Northland_Ckt_979_RECONDUCTOR ERCOT project 86323 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2033 | 9128 to 9238 Travis County |
| AEN_Lakeshore_Northland_Ckt_916_Reconductor ERCOT project 86321 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2033 | 9128 to 9228 Travis County |
| AEN_Wheless_Mueller_Ckt_1016_Reconductor ERCOT project 86331 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2033 | 9291 to 9342 Travis County |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner