Across all listed projects, the workbook’s terminal columns printed 267 planning-model bus numbers, 21 placeholders such as “NEWSUB” and 6 model identifiers in place of a name. None is treated as a substation name.

ProjectUtilityStatus as reportedkVProjected in serviceTerminals
Add Branch between Padua and Sommers
ERCOT project 79683
CPS
Tier 4
Planned
Completed tab
138 Feb 2025
actual 2025-02
5395 to 170722
Bexar County
16th Street auto transformer replacement/addition.
ERCOT project 99746
TNMP
Tier 4
In-Service
Current-year planned tab
138 Apr 2025 No terminals printed
Avila BESS 138kV Gen Tie.
ERCOT project 90446
TNMP
Tier 4
Under Construction
Current-year planned tab
138 May 2025 No terminals printed
Pecos County
Replacement of Lake Whitney auto transformer.
ERCOT project 99776
TNMP
Tier 4
In-Service
Current-year planned tab
138 May 2025 No terminals printed
Evelyn BESS 138kV Gen Tie.
ERCOT project 90393
TNMP
Tier 4
Under Construction
Current-year planned tab
138 May 2025 No terminals printed
Galveston County
PMCR for 2nd TX in Coachwhip
ERCOT project 82321
TNMP
Tier 4
Not reported
Current-year planned tab
138 May 2025 No terminals printed
Addition of facilities installed at OCI ALAMO 1 substation to install a Gen-Tie to Power Soportar Battery Energy Storage System (BESS).
ERCOT project 89905
CPS
Tier 4
Planned
Completed tab
138 May 2025
actual 2025-05
5007 to 171082
Headcamp BESS 138kV Gen Tie.
ERCOT project 90450
TNMP
Tier 4
Under Construction
Current-year planned tab
138 Jun 2025 No terminals printed
Pecos County
Add Cochise customer sub.
ERCOT project 100408
TNMP
Tier 4
In-Service
Current-year planned tab
138 Jul 2025 No terminals printed
Bocanova BESS 138kV Gen Tie.
ERCOT project 90448
TNMP
Tier 4
Under Construction
Current-year planned tab
138 Jul 2025 No terminals printed
Brazoria County
Addition of the Mainland to Vertus 138KV line.
ERCOT project 99859
TNMP
Tier 4
Planned
Current-year planned tab
138 Sep 2025 No terminals printed
RCEC_BranchChanges_Kaufman_Update3
Modifying branch impedance between I20_RC and TALTY_RC
ERCOT project 87510
RCEC
Tier 4
Planned
Current-year planned tab
138 Dec 2025 No terminals printed
RCEC_Add_CavenderBus
Adding Cavender Bus, Load and Branch from Cavender to Cavender_P8
ERCOT project 87475
RCEC
Tier 4
Planned
Current-year planned tab
138 Dec 2025 No terminals printed
Models Pilot Point
ERCOT project 104036
TNMP
Tier 4
In-Service
Current-year planned tab
138 Dec 2025 No terminals printed
Denton County
Adds an additional line and energize load.
Adds a bundled double circuit line and energize both loads at Pilot Point bus #37365.
ERCOT project 82250
TNMP
Tier 4
Planned
Current-year planned tab
138 Dec 2025 No terminals printed
New substation for generation interconnection project for 21INR0359
ERCOT project 75792
LST
Tier 4
Planned
Current-year planned tab
345 Dec 2025 No terminals printed
Bosque County
Add_Josephine_Load
Tapping the Nevada and Shelby transmission line, and adding Josephine Load.
ERCOT project 72651
RCEC
Tier 4
Not reported
Current-year planned tab
138 Dec 2025 No terminals printed
John_Dumas_Circuit_Breaker_Addition
ERCOT project 92600A · utility no. PLC-7999
LCRATSC
Tier 4
Planned
Completed tab
345 Dec 2025
actual 2025-12
No terminals printed
Caldwell County
John_Dumas_Circuit_Breaker_Addition
ERCOT project 92600B · utility no. PLC-7999
LCRATSC
Tier 4
Planned
Completed tab
345 Dec 2025
actual 2025-12
No terminals printed
Trading Post to Cedar Valley Storm Hardening
Upgrading switch to bring line to full rating
ERCOT project 72588C
PEC
Tier 4
Not reported
Completed tab
138 Dec 2025
actual 2025-05
No terminals printed
No title printed
ERCOT project 87477
RCEC
Tier 4
Planned
Completed tab
138 Dec 2025
actual 2025-04
No terminals printed
This involves moving Harmony to a different bus/bay at Hill Country to alleviate the loading on HC auto 3 & 4.
Move Harmony - Hill Country from Auto 3&4 to Hill Country Auto 1&2. This involves moving Harmony to a different bus/bay at Hill Country to alleviate the loading on HC auto 3 & 4.
ERCOT project 99187
CPS/NO
Tier 4
In-Service
Completed tab
138 Dec 2025
actual 2025-12
5195 to 5210
Bexar County
Upgrade Metering CT
Upgrading the Metering CT for Elm Creek to Skyline Circuit 2. This upgrade will result in a rating increase for this transmission line.
ERCOT project 71879 · utility no. S-0939b
CPS/NO
Tier 4
In-Service
Completed tab
345 Jan 2026
actual 2026-01
5133 to 5371
Guadalupe / Bexar County
Models YELLOWJACKET
ERCOT project 103801
TNMP
Tier 4
Not reported
Current-year planned tab
138 Apr 2026 No terminals printed
Brazoria County
RCEC_Commerce_South_Load
Adding Commerce South Bus, Load and Branch from Saddle to Comm_S1_8
ERCOT project 89957
RCEC
Tier 4
Planned
Current-year planned tab
138 May 2026 No terminals printed
Hunt County
This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4.
Move Potranco - Cagnon from Auto 3 & 4 to Cagnon Auto 1 & 2. This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4.
ERCOT project 99185
CPS/NO
Tier 4
In-Service
Completed tab
138 May 2026
actual 2026-04
5346 to 5055
Bexar County
LCRATSC_Colton_Elroy_Transmission_Line_Overhaul
Overhaul transmission line structures per LCRA TSC standards and current NESC requirements.
ERCOT project 92561 · utility no. PLC-6951 · RTP 2024-SC20
LCRATSC
Tier 4
Planned
Completed tab
138 May 2026
actual 2026-05
7208 to 7209
Travis County
LCRATSC_Canyon_San_Marcos_Transmission_Line_Upgrade
ERCOT project 92575 · utility no. PLC-7656 · RTP 2024-SC1
LCRATSC
Tier 4
Planned
Completed tab
138 May 2026
actual 2026-04
7192 to 7200
Hays County
Bluebonnet - Wyldwood Transmission Line Overhaul
Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee.
ERCOT project 92598 · utility no. PLC-6949 · RTP 2024-SC20
LCRATSC
Tier 4
Planned
Completed tab
138 May 2026
actual 2026-02
7210 to 7556
Bastrop County
Models Rice Tap
ERCOT project 104040
TNMP
Tier 4
Not reported
Current-year planned tab
138 Jun 2026 No terminals printed
Collin / Grayson County
No title printed
ERCOT project 105583
DME
Tier 4
Planned
Completed tab
138 Jul 2026
actual 2026-07
No terminals printed
Denton County
Switchyard to accommodate for Telios Large Load.
Added Kirkland and Telios bus, along with load and branches
ERCOT project 91555
RCEC
Tier 4
Planned
Current-year planned tab
138 Aug 2026 No terminals printed
138kV transmission upgrade to serve Kirkland large load.
Modifying branch info between BLDSW_RC and BLACKLND_8
ERCOT project 91558
RCEC
Tier 4
Planned
Current-year planned tab
138 Aug 2026 No terminals printed
add 19.2 MVAR Capacitor at Rio Colorado
ERCOT project 90851
STEC
Tier 4
Planned
Current-year planned tab
69 Aug 2026 No terminals printed
Red Egret BESS 138kV Gen Tie.
ERCOT project 90452
TNMP
Tier 4
Under Construction
Current-year planned tab
138 Aug 2026 No terminals printed
Galveston County
Add Fort Bobcat load serving station and Tline to STEC Orange Grove
ERCOT project 102871
STEC
Tier 4
Planned
Current-year planned tab
138 Sep 2026 No terminals printed
Nueces County
RCEC_RockWallHwy276Load
Adding Rockwall Highway Bus, Load and Branch from RockWallHwy to RCKWL_E1_8
ERCOT project 89959
RCEC
Tier 4
Planned
Current-year planned tab
138 Oct 2026 No terminals printed
RCEC_BranchChanges_Kaufman_Update4
Updating branch info between I20_RC and COMBINRC1
ERCOT project 87512
RCEC
Tier 4
Planned
Current-year planned tab
138 Oct 2026 No terminals printed
BEPC_TPIT102563_BrushieCap
ERCOT project 102563
BEPC
Tier 4
Planned
Current-year planned tab
69 Oct 2026 199
Navarro County
Upgrade Eustace-Walton line to Cumberland conductor
ERCOT project 91174
RCEC
Tier 4
Planned
Current-year planned tab
138 Nov 2026 No terminals printed
Addition of PEC CementPlant_Substation
Adding PEC CementPlant_Substation substation. Adding bus, branch, and load.
ERCOT project 91596
PEC
Tier 4
Planned
Current-year planned tab
138 Nov 2026 No terminals printed
RCEC_BranchChanges_Kaufman_Update5
Updating line info between Boze and CombineRC1
ERCOT project 87514
RCEC
Tier 4
Planned
Current-year planned tab
138 Nov 2026 No terminals printed
Add Embar 138 kV POD
ERCOT project 93299
ONCOR
Tier 4
Planned
Current-year planned tab
138 Nov 2026
actual 2026-11
No terminals printed
BEPC_TPIT102630_Merryman
ERCOT project 102630
BEPC
Tier 4
Planned
Current-year planned tab
138 Dec 2026 No terminals printed
Robertson County
23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit
This project is Phase 1 of the Spruce to Pawnee Double Circuit Rebuild. This Phase captures the completion of the new second circuit from Spruce to Pawnee with the final rating of circuit 2.
ERCOT project 100018 · utility no. T-0400 · RPG 23RPG032
CPS/CPS, STEC
Tier 1
Under Construction
Current-year planned tab
345 Dec 2026 5400 to 5725
Bexar / Karnes County
BEPC_TPIT102767_OldGarner
ERCOT project 102767
BEPC
Tier 4
Planned
Current-year planned tab
138 Dec 2026 No terminals printed
Parker County
Add Mosquito Lake Gen POI
ERCOT project 99596
TNMP
Tier 4
Planned
Current-year planned tab
138 Dec 2026 No terminals printed
23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit
This project is phase 2 of the Spruce to Pawnee Double circuit rebuild. Phase 2 captures the CPS owned portion of the existing Spruce to Pawnee circuit 1 being upgraded. The remaining STEC owned portion will be upgraded/completed at a later date.
ERCOT project 100020 · utility no. T-0400 · RPG 23RPG032
CPS/CPS, STEC
Tier 1
Under Construction
Current-year planned tab
345 Dec 2026 5400 to 5725
Bexar / Karnes County
Hornsby Load Power Transformer Addition
ERCOT project 91847B · utility no. PLC-8186
LCRATSC
Tier 4
Planned
Current-year planned tab
345 Dec 2026 No terminals printed
This project will create a POI Bus (station) named Skydancer to interconnect 23INR0295
ERCOT project 75786
LST
Tier 4
Planned
Current-year planned tab
345 Dec 2026 No terminals printed
Bosque County
San Antonio South Reliability RPG Project
Rebuild approximately 3 circuit miles of 138KV Transmission from Leon Creek to South San to meet current CPS Energy and industry standards. The new line will require a rating of 478MVA.
ERCOT project 75255F · RPG 22RPG048
CPS/NO
Tier 1
Under Construction
Future tab
138 Jan 2027 5260 to 5385
Bexar County
Install a new 138kV switchyard to connect new El Patrimonio Solar PV Generation. The switchyard will be looped into the existing 138 kV Leon Creek to Trumbo transmission line.
ERCOT project 109924 · utility no. T-0374
CPS/NO
Tier 4
Under Construction
Future tab
138 Jan 2027 5333 to 5260, 5429
Bexar County
San Antonio South Reliability RPG Project
The Leon Creek to Howard Rd circuit should be upgraded to 698 MVA, minimum.
ERCOT project 75255C · RPG 22RPG048
CPS/NO
Tier 1
Under Construction
Future tab
138 Jan 2027 5230 to 5260
Bexar County
RCEC_Horton_Load
Added Horton bus, along with load and branches
ERCOT project 89961
RCEC
Tier 4
Planned
Future tab
138 Mar 2027 No terminals printed
Models ALUVIUM
ERCOT project 104551
TNMP
Tier 4
Planned
Future tab
138 Mar 2027 No terminals printed
Brazoria County
RCEC_AllenNorthLoad
Adding Allen North Load Bus, Load and Branch from Allen NLoad to RIDGVIEW_8
ERCOT project 89952
RCEC
Tier 4
Planned
Future tab
138 Mar 2027 No terminals printed
Collin County
Fayetteville AT2 Autotransformer Restoration
LCRA will install, test, and commission a replacement 672 MVA Auto Transformer (AT2) to replace the existing failed unit. SMIT will manufacture and design the replacement 672MVA AT2 which is covered under warranty. The new unit will be identical in ratings but shall include additional improvements to mitigate sound level. The sound mitigation options will cost $550,120 and consist of upgraded core…
ERCOT project 99917
LCRATSC
Tier 4
Planned
Future tab
345 Mar 2027 No terminals printed
MODELS FLYCATCHER
ERCOT project 105602
TNMP
Tier 4
Planned
Future tab
138 Mar 2027 No terminals printed
Reeves County
Add Dansk load serving substation
Cuts in new Dansk load serving station on existing Red Bluff to Danevang transmission line
ERCOT project 86782
STEC
Tier 4
Planned
Future tab
138 Apr 2027 No terminals printed
Add Fresa load serving substation
ERCOT project 92890
STEC
Tier 4
Planned
Future tab
69 Apr 2027 No terminals printed
Atascosa County
23RPG032: San Antonio South Reliability II: Rebuild Pawnee to Tango into a double circuit
Rebuild approximately 12 miles of existing horizontal single circuit 345kV transmission infrastructure into new vertical double circuit 345kV transmission infrastructure.
ERCOT project 84900 · utility no. T-0401 · RPG 23RPG032
CPS/CPS, STEC, AEP
Tier 1
Under Construction
Future tab
345 Apr 2027 5725 to 8689
Karnes / Bee County
23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit
The final upgrades on the STEC side will be completed and the ultimate ratings of the double circuit will be realized.
ERCOT project 84902 · utility no. T-0400 · RPG 23RPG032
CPS/CPS, STEC
Tier 1
Under Construction
Future tab
345 Apr 2027 5400 to 5725
Bexar / Karnes County
RCEC_BranchChanges_Kaufman_Update2
Modifying branch impedance between ROSHILRC and TALTY_RC
ERCOT project 87508
RCEC
Tier 4
Planned
Future tab
138 May 2027 No terminals printed
Kaufman County
RCEC_BranchChanges_Kaufman__Update1
Modifying branch impedance between Boze and Scury_RC
ERCOT project 87497
RCEC
Tier 4
Planned
Future tab
138 May 2027 No terminals printed
Kaufman County
24RPG004: Omicron Reliability Project: Rebuild Leon Creek to Pearsal
Rebuild ~1.6 miles of double-ckt from Leon Creek to Pearsall transmission line with normal and emergency ratings of at least 478MVA
ERCOT project 88041 · utility no. T-0396 · RPG 24RPG004
CPS/NO
Tier 2
Under Construction
Future tab
138 May 2027 5260 to 5335
Bexar County
Hill Country Auto #4 will be replaced Summer 2027 to a 10% impedance auto.
ERCOT project 100257 · utility no. S-0959
CPS/NO
Tier 4
Planned
Future tab
345 May 2027 5211
Bexar County
Silverleaf 345kV BUS from TNMP submitted Cowpen/Silverleaf RPG
ERCOT project 105472 · RPG 23RPG013
TNMP
Tier 1
Planned
Future tab
345 May 2027 No terminals printed
Ward County
Hornsby Load Power Transformer Addition
ERCOT project 91847C · utility no. PLC-8186
LCRATSC
Tier 4
Planned
Future tab
138 May 2027 No terminals printed
Upgrading Buda to Manchaca
Upgrading Buda to Manchaca branch to minimum of 379 MVA.
ERCOT project 91626
PEC
Tier 4
Not reported
Future tab
138 May 2027 No terminals printed
Elroy_Wolf_Lane_Transmission_Line_Overhaul
Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee
ERCOT project 92622 · utility no. PLC-6950 · RTP 2024-SC20
LCRATSC
Tier 4
In-Service
Future tab
138 May 2027 No terminals printed
Bastrop / Travis County
Colton_Mendoza_Transmission_Line_Upgrade
Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee
ERCOT project 92627 · utility no. PLC-7994 · RTP 2024-SC20
LCRATSC
Tier 4
Planned
Future tab
138 May 2027 No terminals printed
Caldwell / Travis County
Cedar Hill - Swiftex Transmission Line Upgrade
Corrects topology for Elgin Tap and its associated branches
ERCOT project 85977B · RPG 24RPG014 · RTP 2023-SC15
LCRATSC
Tier 3
Planned
Future tab
138 May 2027 No terminals printed
Elgin - Elgin Tap Transmission Line Overhaul
Perform an overhaul on the 2.2 mile T728 Elgin (structure #17/7) - Elgin Tap 138-kV transmission line.
ERCOT project 85979 · RPG 24RPG014 · RTP 2023-SC15
LCRATSC
Tier 3
Planned
Future tab
138 May 2027
actual 9999-01
No terminals printed
23RPG028: STEC Rio Medina Project: New transmission line between Tally and Ranchtown
Install new 138kV single circuit transmission line from Ranchtown to Talley Road (~12 miles) with normal and emergency ratings of at least 469 MVA. This new transmission line requires a single route CCN.
ERCOT project 84892 · utility no. T-0393 · RPG 23RPG028
CPS/NO
Tier 2
Planned
Future tab
138 May 2027 5422 to 5358
Medina / Bexar County
San Antonio South Reliability RPG Project
Install a 3rd 600MVA 345/138kV autotransformer at Howard.
ERCOT project 75255B · RPG 22RPG048
CPS/NO
Tier 1
Planned
Future tab
345 Jun 2027 5231 to 5230
Bexar County
ALUVIUM gen tie station
ERCOT project 90903
TNMP
Tier 4
Planned
Future tab
138 Jul 2027 No terminals printed
Brazoria County
Add 80 MVar of cap banks at Miami Wind
ERCOT project 110463
CTT
Tier 4
Conceptual
Future tab
345 Aug 2027 No terminals printed
Gray County
BEPC_TPIT102665_Greyfox
ERCOT project 102665
BEPC
Tier 4
Planned
Future tab
138 Sep 2027 No terminals printed
Parker County
MODELS HALITE
ERCOT project 105600
TNMP
Tier 4
Planned
Future tab
138 Oct 2027 No terminals printed
Pecos County
BEPC_TPIT102632_BLACKTHORN
ERCOT project 102632
BEPC
Tier 4
Planned
Future tab
69 Oct 2027 No terminals printed
Ellis County
Elvis (EVS) 138kV CEHE Substation for ROCK N ROLL Storage (24INR0234)
Install one generator lead from Elvis (EVS) 138kV CEHE Substation to customer-owned ROCK_N (RNR) for ROCK N ROLL Storage (24INR0234) customer substation.
ERCOT project 90134B
CNP
Tier 4
Planned
Future tab
138 Oct 2027 ROCK_N
Brazoria County
RCEC_Peerless_Load
Adding Pearless Bus, Load and Branch from Pearless to PRLS_RC
ERCOT project 89955
RCEC
Tier 4
Planned
Future tab
138 Nov 2027 No terminals printed
Hopkins County
BEPC_TPIT_KosseSW_Kosse
ERCOT project 102559
BEPC
Tier 4
Planned
Future tab
69 Nov 2027 85 to 89
Limestone County
Add Liendo load serving substation
ERCOT project 93048
STEC
Tier 4
Planned
Future tab
138 Dec 2027 No terminals printed
Waller County
Upgrade Sargent to Franklins Camp 2025 RTP
ERCOT project 102867
STEC
Tier 4
Planned
Future tab
69 Dec 2027 No terminals printed
Upgrades conductor rating
ERCOT project 108819 · utility no. PBRP Upgrade L13
TNMP
Tier 4
Planned
Future tab
138 Dec 2027 No terminals printed
Add Moursund load serving station
ERCOT project 102865
STEC
Tier 4
Planned
Future tab
138 Dec 2027 No terminals printed
Victoria County
BEPC_NOTPIT_ClarkLakeVoltConv1
ERCOT project 70012A
BEPC
Tier 4
Planned
Future tab
138 Dec 2027 No terminals printed
Parker County
Whitebaker 345kV - Part of Upgrade L13 2024 Permian Basin Study
ERCOT project 92274 · utility no. PBRP Upgrade L13
TNMP
Tier 1
Planned
Future tab
345 Dec 2027 No terminals printed
BEPC_TPIT102661_Pursley
ERCOT project 102661
BEPC
Tier 4
Planned
Future tab
69 Dec 2027 No terminals printed
Navarro County
Cowpen 345kV Bus from TNMP submitted Cowpen/Silverleaf RPG
ERCOT project 105470 · RPG 23RPG013
TNMP
Tier 1
Planned
Future tab
345 Dec 2027 No terminals printed
Reeves County
Georgetown Power Transformer Upgrade
Upgrade the Georgetown 138-kV transmission bus to a four circuit breaker improved bus with Gas Insulated Switchgear (GIS). The new switchgear and all 138-kV series equipment should be rated at 4000 continuous amps. Upgrade Georgetown T1 and Georgetown T2.
ERCOT project 99919
LCRATSC
Tier 4
Planned
Future tab
138 Dec 2027 No terminals printed
BEPC_TPIT102659_KellerUpgrade
ERCOT project 102659
BEPC
Tier 4
Planned
Future tab
138 Jan 2028 565 to 1856
Tarrant County
AEN_McNeil_JustinLn_Ckt_811_Reconductor
Reconductor 3.98 miles of circuit to 3000 Amps.
ERCOT project 105624
AEN
Tier 4
Planned
Future tab
69 Jan 2028 9291 to 9342
Travis County
Rebuild ~3 miles of double-ckt from VLSI to Grissom transmission line with normal and emergency ratings of at least 478MVA
Rebuild ~3 miles of double-ckt from VLSI to Grissom transmission line with normal and emergency ratings of at least 478MVA. Note: Only the conductor needs to be upgraded. All other substation equipment is rated at least 2000A or 478MVA.
ERCOT project 92743 · utility no. T-0377
CPS/NO
Tier 4
Planned
Future tab
138 Jan 2028 5467 to 5185
Bexar County
BEPC_NOTPIT_ClarkLakeVoltConv1
ERCOT project 70012B
BEPC
Tier 4
Planned
Future tab
138 Mar 2028 No terminals printed
BEPC_NOTPIT_ClarkLakeVoltConv1
ERCOT project 70012C
BEPC
Tier 4
Planned
Future tab
138 Mar 2028 No terminals printed
Parker County
BEPC_NOTPIT_ClarkLakeVoltConv1
ERCOT project 70012D
BEPC
Tier 4
Planned
Future tab
138 Mar 2028 No terminals printed
BEPC_TPIT102755_Dennis
ERCOT project 102755
BEPC
Tier 4
Planned
Future tab
138 Mar 2028 No terminals printed
Parker County
STEC Mesquite Large Load Project Phase 1
Construct Mesquite large load 345-kV POI
ERCOT project 110828
STEC
Tier 2
Conceptual
Future tab
345 Apr 2028 No terminals printed
BEPC_TPIT102670_Rockett
ERCOT project 102670
BEPC
Tier 4
Planned
Future tab
69 Apr 2028 No terminals printed
Ellis County
BEPC_TPIT10264_Egan_HappyHill_Improvement
ERCOT project 102634
BEPC
Tier 4
Planned
Future tab
138 Apr 2028 438 to 412
Johnson County
Upgrade Franklins Camp Auto
ERCOT project 102875
STEC
Tier 4
Conceptual
Future tab
138 May 2028 No terminals printed
Brazoria County
Upgrading line
Upgrading conductor to 1xSuwannee
ERCOT project 99522
PEC
Tier 4
Not reported
Future tab
138 May 2028 No terminals printed
Upgrading Buda to Rutherford
Upgrading Buda to Rutherford branch to minimum 379 MVA.
ERCOT project 91628
PEC
Tier 4
Not reported
Future tab
138 May 2028 No terminals printed
LCRATSC_Gabriel-Schwertner TL conversion
This project is needed to meet a request from BEPC to voltage convert (69-138-kV) and increase the capacity of the BEPC-owned Gabriel - Schwertner circuit on the TSC-owned 138-kV T359 transmission line. As part of this upgrade, LCRA TSC will upgrade conductor on T359 from Gabriel to Str. 21R.
ERCOT project 91293 · utility no. PLC-8197
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 No terminals printed
Williamson County
Lockhart Mendoza Transmission Line Overhaul
Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee
ERCOT project 92572 · utility no. PLC-8191 · RTP 2024-SC20
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 No terminals printed
Caldwell County
Bastrop West - Bluebonnet Transmission Line Upgrade
Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee.
ERCOT project 92602 · utility no. PLC-8101 · RTP 2024-SC20
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 7555 to 7556
Bastrop County
36th St to Merida - 138 kV Transmission Line Rebuild
Rebuild approximately four circuit miles of 138 kV transmission from 36th Street to Merida
ERCOT project 17TPIT0001 · utility no. T-0196
CPS
Tier 4
Planned
Future tab
138 May 2028 5427 to 5310
Bexar County
CPSE_Rafter 138kV Cap Bank
ERCOT project 50645 · utility no. S-0922 · RPG 24RPG004
CPS/NO
Tier 4
Planned
Future tab
138 May 2028 5355
Bexar County
Comfort_Kendall_Transmission_Line_Upgrade
ERCOT project 100285B
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 No terminals printed
23RPG028: STEC Rio Medina Project: Upgrade transmission line between Tally and Texas Research
Upgrade existing Talley to TX Research line (~8 miles) to at least 469 MVA with a two-hour emergency rating, based on preliminary review should not require pole replacement. This transmission rebuild is in support of the Rio Medina RPG Project. This rebuild would prevent overloading the transmission system under adverse conditions.
ERCOT project 84894 · utility no. T-0392 · RPG 23RPG028
CPS/NO
Tier 2
Planned
Future tab
138 May 2028 5422 to 5430
Medina / Bexar County
Add 230 MVAr of cap bank
ERCOT project 110182
CTT
Tier 4
Conceptual
Future tab
345 May 2028 No terminals printed
Leon County
Helotes to Hill Country 2nd Ckt Addition and Rebuild
ERCOT project 110911 · utility no. T-XXXX
CPS
Tier 1
Conceptual
Future tab
345 Jun 2028 No terminals printed
Add Reactive Support at Spruce
ERCOT project 110921
CPS
Tier 4
Conceptual
Future tab
345 Jun 2028 No terminals printed
Models TNMP Galveston RPG study
ERCOT project 103257
TNMP
Tier 2
Planned
Future tab
138 Jun 2028 No terminals printed
Galveston / Brazoria County
Upgrading line to bundled drake
ERCOT project 99516
PEC
Tier 4
Not reported
Future tab
138 Jun 2028 No terminals printed
Adding Highway 71 between Wirtz and Johnson city
Adding highway 71 into the model Summer 2028
ERCOT project 91621
PEC
Tier 4
Not reported
Future tab
138 Jun 2028 No terminals printed
BPUB Branch Changes
Removing branch Price to Loma, adding Price to Stillman, adding another branch Loma Alta to Stillman.
ERCOT project 81895
BPUB
Tier 4
Planned
Future tab
138 Jun 2028 59410, 5962 to 79601, 79601
Cameron County
This models upgrades required for a proposed load addition.
Install 300 MVAR capacitor bank at the NewSub.
ERCOT project 110077C
CNP
Tier 4
Conceptual
Future tab
345 Jul 2028 NewSub
Waller County
Adds 2nd circuit from Allen Creek to Gray
ERCOT project 110467
CTT
Tier 3
Conceptual
Future tab
345 Aug 2028 No terminals printed
Gray / Hall County
Add double ckt line from Allen Creek to Cross (Red Rock)
ERCOT project 110471
CTT
Tier 3
Conceptual
Future tab
345 Aug 2028 No terminals printed
Gray / Hall County
Tap 2nd Limestone - Gibbons Creek ckt into CTT Iron Horse
ERCOT project 110645
CTT
Tier 3
Conceptual
Future tab
345 Aug 2028 No terminals printed
Leon County
BEPC_TPIT102685_Add_Delia
ERCOT project 102685
BEPC
Tier 4
Planned
Future tab
69 Sep 2028 No terminals printed
Limestone County
PSH Large Load
Upgrade 138 kV line from Nquin_RC (6883) to Quinl_RC (6884) to Cumberland conductor.
ERCOT project 109810
RCEC
Tier 4
Planned
Future tab
138 Oct 2028 No terminals printed
Hunt County
Faulkner 345kV - Part of Upgrade L5 2024 Permian Basin Study
ERCOT project 92278 · utility no. PBRP Upgrade L5
TNMP
Tier 1
Planned
Future tab
345 Dec 2028 No terminals printed
Pecos / Reeves County
BEPC_TPIT_FortGatesSW_FortGates
ERCOT project 102561
BEPC
Tier 4
Planned
Future tab
69 Dec 2028 250 to 254
Coryell County
25RPG020 CPS Energy Large Load Additions Project: Rebuild Cagnon to VLSI transmission line
Rebuild (8.7 miles) Cagnon to VLSI transmission line to at least 478MVA
ERCOT project 99207 · utility no. T-0397 · RPG 25RPG020
CPS/NO
Tier 1
Planned
Future tab
138 Jan 2029 5055 to 5467
Bexar County
Cooke County Resiliency Project
Rebuild the Sivells Bend Tap to Sivell’s bend transmission line
ERCOT project 110943B · RPG 26RPG007
BEPC
Tier 2
Planned
Future tab
69 Feb 2029 No terminals printed
Cooke County
Install a new 138kV transmission loop and switchyard to connect new Moonstone Solar PV Generation
ERCOT project 109958 · utility no. T-0414
CPS/NO
Tier 4
Planned
Future tab
138 Mar 2029 5313 to 5132, 5155
Wilson County
BEPC_TPIT102667_Bream
ERCOT project 102667
BEPC
Tier 4
Planned
Future tab
138 Apr 2029 No terminals printed
Robertson County
STEC_110870_MesquiteLargeLoadProjectPhase2
Install up to 250 MVAR of dynamic reactive support at 91302 RODG_EDW POI 138-kV Substation Install up to 250 MVAR of dynamic reactive support at 5727 PAWNEESUB8 138-kV Substation
ERCOT project 110870
STEC
Tier 2
Conceptual
Future tab
138 May 2029 No terminals printed
STEC Palangana Large Load Addition Phase 1
Install up to 250 MVAR of dynamic reactive support at 91302 RODG_EDW POI 138-kV Substation Install up to 250 MVAR of dynamic reactive support at 5727 PAWNEESUB8 138-kV Substation
ERCOT project 110581
STEC
Tier 2
Conceptual
Future tab
138 May 2029 No terminals printed
Upgrading line
Upgrade conductor to 1xSuwannee
ERCOT project 99524
PEC
Tier 4
Not reported
Future tab
138 May 2029 No terminals printed
Eagle Lake - El Campo Transmission Line Overhaul
Perform an overhaul on the 38.2 mile T548 Eagle Lake - El Campo (including all tap lines) 69-kV transmission line. Per LCRA TSC Transmission System Planning procedure, replacement structures will be capable of operating at 138-kV.
ERCOT project 99913
LCRATSC
Tier 3
Planned
Future tab
69 May 2029 No terminals printed
The New Generation Facility will be looped into the 345 kV Elm Creek to South Texas Project (STP) circuit 1
ERCOT project 109966 · utility no. T-0420
CPS/NO
Tier 4
Planned
Future tab
345 May 2029 5236 to 5320, 5380
Guadalupe / Wilson County
Install new 138kV transmission loop and substation
ERCOT project 111364
CPS/NO
Tier 4
Planned
Future tab
138 May 2029 5230 to 5326
Bexar County
Rebuild Apache-Amoco with bundled 795 ACSS
ERCOT project 60502
TNMP
Tier 4
Not reported
Future tab
138 May 2029 No terminals printed
Rebuild Caddo-Apache with bundled 795 ACSS
ERCOT project 60504
TNMP
Tier 4
Not reported
Future tab
138 May 2029 No terminals printed
Rebuild Hidden Lakes-League City with 795 ACSS
ERCOT project 60522
TNMP
Tier 4
Not reported
Future tab
138 May 2029 No terminals printed
Rebuild West Columbia Local-Angleton with 795 ACSS
ERCOT project 60526
TNMP
Tier 4
Not reported
Future tab
138 May 2029 No terminals printed
Second 138 kV transmission Line from DL-DP CKT1034
Second 138 kV transmission Line from Dunlap to Decker CKT1034
ERCOT project 67091
AEN
Tier 4
Planned
Future tab
138 Jun 2029 9045 to 9188
Travis County
Grandview Highland Hills Rebuild
CPSE_Rebuild of 138 kV double circuit line Line between Grandview to Highland Hills.
ERCOT project 45029 · utility no. T-0273
CPS/NO
Tier 4
Planned
Future tab
138 Jun 2029 5175 to 5205
Bexar County
BRYN_Standard_PMCR_Dansby_Rebuild_fix
Reference Project 4577 which was added to convert Dansby 69kV bus to Breaker and a Half configuration
ERCOT project 70307A
BRYN
Tier 4
Planned
Future tab
69 Jun 2029 No terminals printed
Brazos County
BRYN_Standard_PMCR_Dansby_Rebuild_fix
ERCOT project 70307B
BRYN
Tier 4
Planned
Future tab
69 Jun 2029 No terminals printed
Brazos County
Altair - Eagle Lake Transmission Line Overhaul
Perform an overhaul on the 11.4 mile T547 Altair - Eagle Lake (including all tap lines) 69-kV transmission line. Per LCRA TSC Transmission System Planning procedure, replacement structures will be capable of operating at 138-kV.
ERCOT project 99908
LCRATSC
Tier 4
Planned
Future tab
69 Jun 2029 No terminals printed
STEC Mesquite Large Load Project Phase 3
Upgrade 8162 COLETO4A - 8172 VICTORIA4A 138-kV Line CKT 1 Upgrade 8162 COLETO4A - 8172 VICTORIA4A 138-kV Line CKT 2 Upgrade 8535 POMPANO4A - 8735 CHALYBE4A 138-kV Line CKT 1 Upgrade 5705 FOWLERTNSUB8 - 5723 LOSANGLESUB8 138-kV Line CKT 1 Add a minimum 15MVAR shunt on 8412 REFUGIO4A or 8813 QUINTANA4A Upgrade 5689 AEPCHKCNSUB8 - 8404 SIGMOR4A 138-kV Line CKT 1 Upgrade 5723 LOSANGLESUB8 - 8612 REVEI…
ERCOT project 110872
STEC
Tier 2
Conceptual
Future tab
138 Jul 2029 No terminals printed
STEC Palangana Large Load Project Phase 2
Install reactive support at 80013 LARDVNTH4A 138-kV Substation
ERCOT project 110845
STEC
Tier 2
Conceptual
Future tab
138 Jul 2029 No terminals printed
Construct a new CPS Owned switchyard to connect new Lavender BESS Generation Project
ERCOT project 109972 · utility no. T-0419
CPS/NO
Tier 4
Planned
Future tab
138 Jul 2029 5280 to 5110, 5255
Bexar County
STEC Palangana Large Load Project Phase3
Establish CCNG Palangana 345-kV POI Install reactive support at Palanaga POI to achieve unity power factor AEP Laredo Area Upgrades RPG Option 3
ERCOT project 110847
STEC
Tier 2
Conceptual
Future tab
345 Sep 2029 No terminals printed
STEC Mesquite Large Load Project Phase 4
Install 200MVAR reactive support at Palangana POI to achieve unity power factor
ERCOT project 110874
STEC
Tier 2
Conceptual
Future tab
345 Sep 2029 0 to 0
BRYN_6666_Steele_Store_to_Cooks_Point
Construct 138kV line from BTU Steele Store to LCRA Cooks Point (Bundled 1033 ACSR - Curlew & 959 ACSS Suwannee)
ERCOT project 6666 · RPG 25RPG001
BRYN/BTU AND LCRA TSC
Tier 1
Planned
Future tab
138 Oct 2029 32852 to 7569
Brazos / Burleson County
BEPC_TIER1_Goatherd
ERCOT project 105626 · RPG 25RPG004
BEPC
Tier 1
Planned
Future tab
138 Dec 2029 No terminals printed
Ellis County
Install a 3rd 600MVA autotransformer at Eastside.
ERCOT project 110126 · RPG 25RPG013 and 25RPG017
CPS/NO
Tier 1
Planned
Future tab
345 Jan 2030 5137 to 5136
Bexar County
Rebuild Spruce to Eastside Double Circuit
ERCOT project 87693
CPS
Tier 3
Planned
Future tab
345 Jan 2030 No terminals printed
Cooke County Resiliency Project
Construct a new breaker station “Bulcher” near Bulcher, TX Construct a new transmission line from Bulcher to Capps Corner Construct a new transmission line from Bulcher to Sivell’s Bend
ERCOT project 110943A · RPG 26RPG007
BEPC
Tier 2
Planned
Future tab
69 Mar 2030 No terminals printed
Cooke County
Add 180MAr Cap at Elm Creek
ERCOT project 110677
CPS/NO
Tier 4
Conceptual
Future tab
345 Mar 2030 5133
Bexar County
Rebuild Elm Creek to STP dbl Ckt
ERCOT project 110665 · utility no. T-XXXX
CPS/NO
Tier 1
Conceptual
Future tab
345 Mar 2030 No terminals printed
Bexar County
BEPC_TPIT102762_Whitney_Itasca
ERCOT project 102762
BEPC
Tier 4
Planned
Future tab
69 Mar 2030 No terminals printed
Bosque County
Upgrade Aloe to Warburton
ERCOT project 102873
STEC
Tier 4
Conceptual
Future tab
69 May 2030 No terminals printed
Victoria County
Upgrade Bakersfield to Schneeman Draw
Upgrade Bakersfield - Cedar Canyon - Noelke - Schneeman Draw as part of the Permian Basin Reliability plan (project L15)
ERCOT project 102877
STEC
Tier 4
Planned
Future tab
345 May 2030 No terminals printed
Rebuild Elm Creek to Skyline
ERCOT project 110637 · utility no. T-XXXX
CPS/NO
Tier 1
Conceptual
Future tab
345 May 2030 5133 to 5371
Bexar County
BEPC_TPIT102663_Pursley_Emmett
ERCOT project 102663
BEPC
Tier 4
Planned
Future tab
69 May 2030 No terminals printed
Navarro County
Orchrid_138_Switchyard
ERCOT project 110935
CPS
Tier 3
Conceptual
Future tab
138 Jun 2030 No terminals printed
Bottlebrush 345kV - Part of Upgrade L13 2024 Permian Basin Study
ERCOT project 92276 · utility no. PBRP Upgrade L13
TNMP
Tier 1
Planned
Future tab
345 Jun 2030 No terminals printed
Pecos County
Castroville_to_Rafter_DblCkt_&_Rebuild
Rebuild existing Castroville to Rafter ckt 1 (~6 miles) single circuit to have normal and emergency ratings of at least 3000A. Construct new Castroville to Rafter ckt 2 (~6 miles) to match ratings of ckt 1
ERCOT project 110907 · utility no. T-XXXX
CPS
Tier 3
Conceptual
Future tab
138 Jun 2030 5083 to 5355
Medina County
WOH Area Upgrades
ERCOT project 110913
CPS
Tier 4
Conceptual
Future tab
138 Jun 2030 No terminals printed
Omicron Area Upgrades
ERCOT project 110915
CPS
Tier 4
Conceptual
Future tab
138 Jun 2030 No terminals printed
New_Grissom_Ingram_Circuit
ERCOT project 110917
CPS
Tier 3
Conceptual
Future tab
138 Jun 2030 No terminals printed
CPS Lylte Tline Rebuilds
ERCOT project 110919
CPS
Tier 4
Conceptual
Future tab
138 Jun 2030 No terminals printed
Castroville_345KVSwitchingStation_Changes
ERCOT project 110923
CPS
Tier 1
Conceptual
Future tab
345 Jun 2030 No terminals printed
Add Reactive Support
ERCOT project 110925
CPS
Tier 4
Conceptual
Future tab
345 Jun 2030 No terminals printed
AEN_Barton_Vega_Ckt_928_Reconductor
ERCOT project 86315
AEN
Tier 4
Planned
Future tab
138 Jun 2030 9158 to 9285
Travis County
AEN_DP_OnionCreek_Ckt_924_Reconductor
ERCOT project 86317
AEN
Tier 4
Planned
Future tab
138 Jun 2030 9187 to 9251
Travis County
AEN_OnionCreek_StoneyRidge_Ckt_1026_Reconductor
ERCOT project 86333
AEN
Tier 4
Planned
Future tab
138 Jun 2030 9237 to 9251
Travis County
AEN_JustinLane_KoenigLane_Ckt__conversion_to_138kV
Justin Lane Koenig Lane convert to 138kV
ERCOT project 86838
AEN
Tier 4
Planned
Future tab
138 Jun 2030 9225 to 9227
Travis County
Addition of Highway 45 substation
Addition of Highway 45 138 kV substation between Buda and Manchaca
ERCOT project 104613
PEC
Tier 4
Planned
Future tab
138 Jul 2030 No terminals printed
BEPC_TIER3_WhitneyAutoUpgrade
ERCOT project 102993 · RPG 25RPG044 · RTP 2023-NC62
BEPC
Tier 3
Planned
Future tab
345 Oct 2030 240
Hill County
STEC Edwards Large Load Addition
-Add a new 345kV path from Howard to Edward - Tap the line from Kendall to Cagnon at 5 miles from Cagnon to add the new CPS substation - Add a new 345kV path from New CPS station to Edward - Add 2 138/345kv autos at Edward with 675 MVA rating - Install 134 MVAR reaction power compensation at Lytle 4A - Upgrade the 138kV line from Bandera to Harmwolf to 371 MVA - Upgrade the 345kV Cachena to ELmcre…
ERCOT project 110515 · RPG 25RPG046
STEC
Tier 1
Conceptual
Future tab
138 Dec 2030 No terminals printed
AEN_MC_DE_CKT909_Reconductor
ERCOT project 110270
AEN
Tier 4
Planned
Future tab
138 Dec 2030 9076 to 9193
Travis County
AEN_DL_AU_CKT920_Reconductor
ERCOT project 110385
AEN
Tier 4
Planned
Future tab
138 Dec 2030 9045 to 9328
Travis County
AEN_Holman_Hillje_ckt_3123_reconductor
ERCOT project 110168
AEN
Tier 4
Planned
Future tab
345 Dec 2030 9073 to 44200
Travis County
AEN_PilotKnob_CarsonCreek_Ckt_944_RECONDUCTOR
ERCOT project 86329
AEN
Tier 4
Planned
Future tab
138 Dec 2030 9175 to 9259
Travis County
buffalo_clover_substation_addition
Adding buffalo Clover PEC bus to Brazos Anduin Bus.
ERCOT project 91578
PEC
Tier 4
Not reported
Future tab
138 Dec 2030 No terminals printed
This models upgrades required for a proposed load addition
Install 650 MVAR of static and dynamic VAR support at 345 kV NewSub.
ERCOT project 110057D
CNP
Tier 4
Conceptual
Future tab
345 Dec 2030 NewSub
Harris County
Upgrading two circuits to bundled Suwannee
ERCOT project 110699
PEC
Tier 4
Conceptual
Future tab
138 Dec 2030 No terminals printed
Upgrading two circuits to bundled Suwannee
ERCOT project 110661
PEC
Tier 4
Conceptual
Future tab
138 Dec 2030 No terminals printed
KC LCP upgrading circuit to bundled Suwanne
Upgrading line T329 as part of AD_HOC TPIT report. Project is purely conceptual as of 7/2/2026.
ERCOT project 110539
PEC
Tier 4
Conceptual
Future tab
138 Dec 2030 No terminals printed
Rebuild Hill Country to Skyline Dbl Ckt
ERCOT project 110687 · utility no. T-XXXX
CPS/NO
Tier 1
Conceptual
Future tab
345 Mar 2031 5211 to 5371
Bexar County
Rebuild Howard to AVR
ERCOT project 110689 · utility no. T-XXXX
CPS/NO
Tier 1
Conceptual
Future tab
345 Mar 2031 5231 to 5475
Bexar County
Rebuild Hunt Lane to Medina Base
ERCOT project 110691 · utility no. T-XXXX
CPS/NO
Tier 4
Conceptual
Future tab
138 Mar 2031 5234 to 5305
Bexar County
Rebuild Medina to Pearsal
ERCOT project 110693 · utility no. T-XXXX
CPS/NO
Tier 4
Conceptual
Future tab
138 Mar 2031 5305 to 5335
Bexar County
Rebuild Talley to Medina
ERCOT project 110695 · utility no. T-XXXX
CPS/LCRA
Tier 4
Conceptual
Future tab
138 Mar 2031 5422 to 7432
Medina / Bandera County
Rebuild Helotes to Ranchtown
ERCOT project 110663 · utility no. T-XXXX
CPS/NO
Tier 4
Conceptual
Future tab
138 Mar 2031 5200 to 5358
Bexar County
Rebuild Hill Country to Marion Dbl Ckt
ERCOT project 110675 · utility no. T-XXXX
CPS/LCRA
Tier 1
Conceptual
Future tab
345 Mar 2031 5211 to 7044
Bexar / Guadalupe County
Rebuild Fair Oaks to LCRA Fair Oaks
ERCOT project 110653 · utility no. T-XXXX
CPS/LCRA
Tier 4
Conceptual
Future tab
138 Mar 2031 5470 to 7169
Bexar / Kendall County
Rebuild Chav to Palo Alto
ERCOT project 110643 · utility no. T-XXXX
CPS/NO
Tier 4
Conceptual
Future tab
138 Mar 2031 5085 to 5330
Bexar County
Cooke County Resiliency Project
Rebuild the St Jo to Capps Corner transmission line Rebuild the Capps Corner to Nocona Transmission Line Rebuild the Nocona to Alcorn Transmission Line Construct a new transmission line from Bulcher to Alcorn
ERCOT project 110943C · RPG 26RPG007
BEPC
Tier 2
Planned
Future tab
69 Mar 2031 No terminals printed
Cooke County
CPSE_Cagnon to Shepherd Rebuild (Phase B)
ERCOT project 71877 · utility no. T-0281
CPS
Tier 4
Planned
Future tab
138 May 2031 No terminals printed
LCRATSC_Euclid_Misty_Transmission_Line_Addition
This project will construct two (2) new 345-kV transmission lines between Euclid and Misty substations.
ERCOT project 105648 · RPG 26RPG001
LCRATSC
Tier 1
Planned
Future tab
345 Jun 2031 No terminals printed
Caldwell County
Cooke County Resiliency Project
Convert existing 69 kV line from Gainesville to St Jo to 138 kV operation including: Gainesville, (future) Bud Long, (future) Hinton, Red River, (future) Gateway, (future) Army Camp, Sivells Bend, (future) Bulcher, Capps Corner, Nocona, Alcorn and St Jo
ERCOT project 110943D · RPG 26RPG007
BEPC
Tier 2
Planned
Future tab
138 Sep 2031 No terminals printed
Cooke County
Rebuild the existing Five_pts to Wstside 138-kV transmission line
ERCOT project 109994 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017
CPS/NO
Tier 1
Planned
Future tab
138 Jan 2032 5150 to 5490
Bexar County
Construct a new CPS Owned switchyard construction and gen tie to accommodate connection to the HUISACHE BESS & SOLAR generation site
ERCOT project 109984 · utility no. S-XXXX · RPG 25RPG013 and 25RPG017
CPS/NO
Tier 1
Planned
Future tab
138 Jan 2032 5241
Bexar County
Rebuild the existing Medinabs to 36th Street 138-kV transmission line
ERCOT project 109940 · utility no. T-XXXX · RPG 25RPG013 and 25RPG017
CPS/NO
Tier 1
Planned
Future tab
138 Jan 2032 5305 to 5427
Bexar County
Upgrade Calallen to Driscoll
ERCOT project 102869
STEC
Tier 4
Conceptual
Future tab
69 May 2032 No terminals printed
Merida to Harlandale Rebuild
CPSE_Merida to Harlandale Rebuild
ERCOT project 45068 · utility no. T-0233
CPS
Tier 4
Planned
Future tab
138 May 2033 No terminals printed
Bexar County
AEN_MagnesiumPlant_Northland_Ckt_979_RECONDUCTOR
ERCOT project 86323
AEN
Tier 4
Planned
Future tab
138 Jun 2033 9128 to 9238
Travis County
AEN_Lakeshore_Northland_Ckt_916_Reconductor
ERCOT project 86321
AEN
Tier 4
Planned
Future tab
138 Jun 2033 9128 to 9228
Travis County
AEN_Wheless_Mueller_Ckt_1016_Reconductor
ERCOT project 86331
AEN
Tier 4
Planned
Future tab
138 Jun 2033 9291 to 9342
Travis County

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first