Ranger Camp 345

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Mitchell County. First named in the release with data as of February 1, 2024.

Mitchellcounty as printed
138, 345kV
ONCORutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Mitchell, TX: ERCOT queue, 17 active of 19. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Ranger Camp 345/138/69 kV Switch
Construct a new 345/138/69 kV Switch to replace existing Morgan Creek Switch
ERCOT project 72007 · utility no. R3024 · RPG 23RPG029
ONCOR
Tier 1
Planned
Completed tab
345 May 2025
actual 2025-04
Ranger Camp 345/138 kV Switch to Ranger Camp 345/138 kV Switch
Mitchell County
Ranger Camp 345
Range Rider - Ranger Camp 138 kV Double-Circuit Line
Construct a new 138 kV Double-Circuit Line from Range Rider to Ranger Camp Switch.
ERCOT project 87861 · utility no. R8722 · RPG 23RPG029
ONCOR
Tier 1
Planned
Current-year planned tab
138 Oct 2026 Ranger Camp 345/138 kV Switch to Range Rider 138 kV Switch
Mitchell County
Ranger Camp 345, Range Rider 138 kV Switch

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
June 1, 202687861Projected in-service dateMay 2026 → Oct 2026
February 1, 202687861Moved between tabsFuture → Current-year planned
October 1, 202587861Moved between tabsCurrent-year planned → Future
October 1, 202587861Projected in-service dateDec 2025 → May 2026
June 1, 202572007Moved between tabsFuture → Completed
June 1, 202587861Moved between tabsFuture → Current-year planned
June 1, 202587861Projected in-service dateNov 2025 → Dec 2025
February 1, 202587861Projected in-service dateMay 2025 → Nov 2025
October 1, 202472007Projected in-service dateDec 2025 → May 2025
October 1, 202487861First listedon the Future tab
June 1, 202472007Projected in-service dateDec 2024 → Dec 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.