Substation Scout

Van Vleck Substation

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Matagorda County. First named in the release with data as of February 1, 2018.

Matagordacounty as printed
69kV
STECutility
1projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Matagorda, TX: ERCOT queue, 23 active of 30. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Van Vleck substation loop
Replaces single circuit radial line connected to a pole mounted switch with a double circuit transmission loop to the Van Vleck substation and upgrades the 4/0 ACSR to 795 ACSR on 138 kV capable poles.
ERCOT project 6685
STEC
Tier 4
Conceptual
Future tab
69 Dec 2029 Van Vleck Substation to Van Vleck Switch
Matagorda County
Van Vleck Substation

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
February 1, 20266685Status as reportedPlanned → Conceptual

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.