Buchanan

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Llano County. First named in the release with data as of June 1, 2021.

Llanocounty as printed
69kV
LCRATSCutility
1projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Llano, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
LCRA TSC Bluffton to Buchanan Transmission Line Overhaul
Overhaul circuit and replace conductor with single-Drake conductor (117 MVA) from Bluffton to Buchanan. Replacement structures should be 138-kV double-circuit capable of supporting a single-Suwannee conductor. Install OPGW.
ERCOT project 71952
LCRATSC
Tier 4
Planned
Current-year planned tab
69 Jun 2026 Bluffton to Buchanan
Llano County
Bluffton, Buchanan

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
February 1, 202671952Moved between tabsFuture → Current-year planned

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.