Hillsboro 138 kV Switch
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Hill County. First named in the release with data as of February 1, 2023.
Also printed as: Hillsboro 69 kV Switch · Hillsboro Switch
A HIFLD substation record has the same name and county: HILLSBORO (HILL County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Hill, TX: ERCOT queue, 23 active of 27. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Establish Hillsboro Switch 138/69 kV Auto #2 ERCOT project 100599 · utility no. R6488 |
ONCOR Tier 4 |
Planned Future tab |
138 | Dec 2028 | Hillsboro 138 kV Switch to Hillsboro 69 kV Switch Hill County |
Hillsboro 138 kV Switch |
| Rebuild the Hillsboro Switch - Ash Creek Switch 138 kV Line ERCOT project 110004 · utility no. R6426 · RPG 25RPG041, 25RPG043 |
ONCOR Tier 1 |
Planned Future tab |
138 | Dec 2029 | Hillsboro Switch to Ash Creek Switch Hill County |
Hillsboro Switch, Ash Creek Switch |
| Rebuild the Hillsboro - Elm Mott 69 kV Line Rebuild the Abbott - Hillsboro Switch 69 kV Line ERCOT project 71910C · utility no. R6221 |
ONCOR Tier 3 |
Planned Future tab |
69 | Dec 2028 | Abbott 69 kV Substation to Hillsboro 69 kV Switch Hill County |
Abbott, Hillsboro 69 kV Switch |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110004 | First listed | on the Future tab |
| February 1, 2026 | 100599 | Projected in-service date | May 2028 → Dec 2028 |
| October 1, 2025 | 100599 | First listed | on the Future tab |
| June 1, 2025 | 71910C | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.