Weslaco
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Hidalgo County. First named in the release with data as of February 1, 2023.
Also printed as: Weslaco Switch
A HIFLD substation record has the same name and county: WESLACO (HIDALGO County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Hidalgo, TX: ERCOT queue, 25 active of 31. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Weslaco Switch: 138 kV Breaker Replacement Replace 138 kV breakers at the Weslaco Switch 138 kV station ERCOT project 103419 · utility no. TP2026026 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Dec 2028 | Weslaco Switch Hidalgo County |
Weslaco Switch |
| Upgrade Heidelberg to AEP Weslaco line Upgrade Heidelberg to STEC WESLACO and STEC WESLACO to AEP Weslaco lines to be 478MVA capable ERCOT project 71928 |
STEC Tier 4 |
Planned Current-year planned tab |
138 | Dec 2026 | Heidelberg to Weslaco Hidalgo County |
Heidelberg, Weslaco |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 103419 | First listed | on the Future tab |
| February 1, 2026 | 71928 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 71928 | Projected in-service date | May 2026 → Dec 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.