WA Parish
Named in 8 listed projects in ERCOT’s transmission project tracking workbook. First named in the release with data as of February 1, 2016.
—county as printed
138, 345kV
CNPutility
8projects listed
No HIFLD substation record has this name in this county.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| PH Robinson to WA Parish Hardening 25RPG028 Rebuild and reconductor Ckt.18C Oasis to WA Parish as a Hardening upgrade ERCOT project 103344E · RPG 25RPG028 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2028 | Oasis to WA Parish | Oasis, WA Parish |
| PH Robinson to WA Parish Hardening 25RPG028 Upgrade Ckt.18C Oasis to WA Parish to increase thermal limits. ERCOT project 103344F · RPG 25RPG028 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2028 | Oasis to WA Parish | Oasis, WA Parish |
| PH Robinson to WA Parish Hardening 25RPG028 Rebuild and reconductor Ckt.99B Oasis to WA Parish as a Hardening upgrade. ERCOT project 103344G · RPG 25RPG028 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2028 | Oasis to WA Parish | Oasis, WA Parish |
| PH Robinson to WA Parish Hardening 25RPG028 Upgrade Ckt.99B Oasis to WA Parish to increase thermal limits. ERCOT project 103344H · RPG 25RPG028 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2028 | Oasis to WA Parish | Oasis, WA Parish |
| PH Robinson to WA Parish Hardening 25RPG028 Upgrade Oasis 345kV fault duty to 63KA. ERCOT project 103344I · RPG 25RPG028 |
CNP Tier 4 |
Planned Future tab |
345 | Dec 2028 | Oasis to WA Parish | Oasis, WA Parish |
| WA Parish 138kV Fault Upgrade with Bus Reactors Reposition existing Ckt.80A WA Parish to Thompsons as part of WAP 138kV West reactor additions ERCOT project 109615F |
CNP Tier 4 |
Planned Future tab |
138 | May 2029 | Thompsons to WA Parish Fort Bend County |
Thompsons, WA Parish |
| WA Parish 138kV Fault Upgrade with Bus Reactors Reposition existing Ckt.82A WA Parish to Thompsons as part of WAP 138kV West reactor additions ERCOT project 109615G |
CNP Tier 4 |
Planned Future tab |
138 | May 2029 | Thompsons to WA Parish Fort Bend County |
Thompsons, WA Parish |
| Phelps (PHE) CEHE Station for SKIPJA (SKP) / Skipjack Energy Storage (26INR0189) Install new Phelps (PHE) 138kV Substation for generator interconnection to SKIPJA (SKP) - Skipjack Energy Storage (26INR0189). Loop into existing Ckt.02B WA Parish to Nash to create new Ckt.02 WA Parish to Phelps to Nash. ERCOT project 91259A |
CNP Tier 4 |
Planned Future tab |
138 | Oct 2027 | Phelps to WA Parish /Nash Brazoria County |
Phelps, WA Parish, Nash |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109615F | First listed | on the Future tab |
| July 13, 2026 | 109615G | First listed | on the Future tab |
| June 1, 2026 | 103344E | First listed | on the Future tab |
| June 1, 2026 | 103344F | First listed | on the Future tab |
| June 1, 2026 | 103344G | First listed | on the Future tab |
| June 1, 2026 | 103344H | First listed | on the Future tab |
| June 1, 2026 | 103344I | First listed | on the Future tab |
| February 1, 2026 | 91259A | Projected in-service date | Feb 2028 → Oct 2027 |
| October 1, 2025 | 91259A | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.