Navarro
Named in 2 listed projects in ERCOT’s transmission project tracking workbook. First named in the release with data as of June 1, 2026.
—county as printed
345kV
ONCORutility
2projects listed
Also printed as: Navarro Switch
No HIFLD substation record has this name in this county.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Navarro Switch - Outlaw Switch 345kV Line ERCOT project 105753 · utility no. R6427 · RPG 25RPG004 · RTP 2024-NC55 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2032 | Navarro Switch to Outlaw Switch | Navarro Switch, Outlaw Switch |
| Notus Switch - Navarro Switch 345 kV Line Upgrade Notus Switch - Navarro Switch 345 kV Line ERCOT project 110475 · utility no. M4479 |
ONCOR Tier 3 |
Conceptual Future tab |
345 | Dec 2030 | Notus to Navarro | Notus, Navarro |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110475 | First listed | on the Future tab |
| June 1, 2026 | 105753 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner