Glasscock
Named in 2 listed projects in ERCOT’s transmission project tracking workbook. First named in the release with data as of October 1, 2022.
—county as printed
138kV
LCRATSCutility
2projects listed
Also printed as: Glasscock Sub
No HIFLD substation record has this name in this county.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| LCRATSC Gabriel Glasscock Transmission Line Upgrade LCRA will upgrade T359 Gabriel - Glasscock 138-kV transmission line to achieve a higher operational rating. This project is coordinated with the Gabriel – Schwertner Transmission Line Upgrade project ERCOT project 109814 · utility no. PLC-8461 |
LCRATSC Tier 4 |
Planned Future tab |
138 | Feb 2030 | Structure 21 to Glasscock Sub Williamson County |
Structure 21, Glasscock Sub |
| Florence Substation Addition ERCOT project 70704A · utility no. PLC-6320 |
LCRATSC Tier 4 |
Planned Completed tab |
138 | May 2025 actual 2025-05 |
Andice to Glasscock Williamson County |
Andice, Glasscock |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109814 | First listed | on the Future tab |
| October 1, 2025 | 70704A | Moved between tabs | Current-year planned → Completed |
| October 1, 2025 | 70704A | Projected in-service date | Jun 2025 → May 2025 |
| June 1, 2025 | 70704A | First listed | on the Current-year planned tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner